File #: 23-6633    Version: 1 Name:
Type: Interlocal Agreement Status: Passed
File created: 11/2/2023 In control: Commissioners Court
On agenda: 11/14/2023 Final action: 11/14/2023
Title: Request for approval of a joint funding structure between the Flood Control District and the Office of the County Engineer for the Goforth Park enhancements. (Addicks Reservoir Watershed, Agreement No. 2019-146, Precinct 3).
Attachments: 1. 111423 JOINT FUNDING AGMT GOFORTH PARK PCT 3 backup

Department: Flood Control District

Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Interlocal Agreement

 

Project ID (if applicable): N/A

Vendor/Entity Legal Name (if applicable): Harris County Engineering Department

 

MWDBE Contracted Goal (if applicable): N/A

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - Goal not applicable to request

 

Request Summary (Agenda Caption):

title

Request for approval of a joint funding structure between the Flood Control District and the Office of the County Engineer for the Goforth Park enhancements. (Addicks Reservoir Watershed, Agreement No. 2019-146, Precinct 3).

end

 

Background and Discussion:

Deputy Darren Goforth Park and the West Road Stormwater Detention Basin/U506-05-00 is situated along upper Horsepen Creek/U106-00-00 in Precinct 3.  Harris County Engineering and Harris County Commissioner Precinct 3 prepared a design for a pump system to be integrated into the existing stormwater detention basin operation. This is an innovative pilot project exploring the use of pump stations as a method to facilitate flood risk reduction. The Flood Control District intends to contribute a maximum of $3,000,000.00 towards the construction of the project from available Bond Z-05 funds.  Upon completion of the project, Harris County Precinct 3 will maintain and operate the pump system. 

 

Expected Impact:

The joint project and funding structure will facilitate more efficient and cost-effective governmental services.   Lastly, this project is another example of how Harris County and Harris County Flood Control District leverage shared infrastructure to explore innovative solutions to help maximize flood risk reduction benefits.  

 

Alternative Options:

If this Joint Funding Structure is not approved, Harris County Engineering and Harris County Commissioner Precinct 3 will be required to seek additional funding sources to complete the project.

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

_ Transportation

X Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

03/31/2015

2.i.10

Interlocal Agreement

 

Location:

Address (if applicable): 9118 Wheat Cross Dr, Houston, TX 77095

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

4.a.3 - Engineering Services

 

FY 24

FY 25

Next 3 FYs

Incremental Expenditures (do NOT write values in thousands or millions)

Labor Expenditures

$

$

$

Non-Labor Expenditures

$3,000,000

$

$

Total Incremental Expenditures

$3,000,000

$

$

Funding Sources (do NOT write values in thousands or millions)

Existing Budget

Bonds

$3,000,000

$

$

Choose an item.

$

$

$

Choose an item.

$

$

$

Total Current Budget

$3,000,000

$

$

Additional Budget Requested

Choose an item.

$

$

$

Choose an item.

$

$

$

Choose an item.

$

$

$

Total Additional Budget Requested

$

$

$

Total Funding Sources

$3,000,000

$

$

Personnel (Fill out section only if requesting new PCNs)

Current Position Count for Service

-

-

-

Additional Positions Requested

-

-

-

Total Personnel

-

-

-

 

Anticipated Court Date: November 14, 2023

Anticipated Implementation Date (if different from Court date):

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District

Attachments (if applicable): Joint Letter and Original Agreement