Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: Flood Control District
Secondary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director
Regular or Supplemental RCA: Regular RCA
Type of Request: Asset Management
Project ID (if applicable): 21090MF1YS01
Vendor/Entity Legal Name (if applicable): City of LaPorte, Texas, a municipal corporation
MWBE Contracted Goal (if applicable): Not applicable
MWBE Current Participation (if applicable): Not applicable
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): Not applicable
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval for Harris County Flood Control District, a political subdivision of the State of Texas to accept a real estate conveyance of a 0.1118 acre drainage easement from the City of LaPorte, Texas, a municipal corporation, tract B512-02-00-00-002.0 for B512-00-00 and Tributaries Conveyance Improvements for the Brookglen Area - B512-02-00-E001 project, UPIN 21090MF1YS01, Precinct 2.
end
Background and Discussion:
The Brookglen Stormwater Detention Basin Phase 2 project is located in Harris County Pct. 2 and within the City of La Porte limits. For Phase 2, the proposed south compartment is bounded by B112-00-00 to the west, Ashwyne Lane to the north, CenterPoint Energy Electric’s property with high voltage transmission facilities to the east, and a transmission line easement to the south. Based on community feedback, the south compartment is being designed with multiple stormwater detention basin cells to avoid the abandonment of Gladwyne Lane. Gladwyne Lane will remain open during construction to maintain the traffic flow within the Brookglen Subdivision. Both stormwater detention basin sites have a dry bottom configuration due to its proximity to Ellington Airport and La Porte Municipal Airport.
Expected Impact:
The objective of this project is to maximize the detention volume storage and help to reduce the risk of flood damage in the Armand Bayou Watershed. In addition, the south detention basin provides the community with an amenity feature option, constructed by others in the future.
Alternative Options:
The alternative option does not proceed to the final design phase of this project. Flood risk in the project area would remain the same.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: R: Enhance disaster preparedness, response, recovery, and resiliency.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): H2: Evaluate the feasibility and potential impacts of substantial, large-scale flood mitigation measures to provide equitable and transformational regional benefits.
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan:
Prior Court Action (if any): None
Date |
Agenda Item # |
Action Taken |
|
|
|
Location:
Address (if applicable): 3324 Somerton Drive, LaPorte, TX 77571
Precinct(s): Precinct 2
Fiscal and Personnel Summary |
Service Name |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
Funding Sources |
|
Existing Budget |
|
|
|
|
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Existing Budget |
$ |
$ |
$ |
$ |
Additional Budget Request (Requires Fiscal Review Request Form) |
|
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Additional Budget Request |
$ |
$ |
$ |
$ |
Total Funding Sources |
$ |
$ |
$ |
$ |
Grants - Proposed Budget (To be filled out by Grants staff only) |
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
Personnel (Fill out section only if requesting new PCNs) |
|
Current Position Count for Service |
- |
- |
- |
- |
Additional Positions Request |
- |
- |
- |
- |
Total Personnel |
- |
- |
- |
- |
Anticipated Court Date: 5/8/2025
Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Michael Ware, Director, Real Property Division
Attachments (if applicable): Drainage Easement; Metes & Bounds