Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD., P.E., PMP, CFM, County Engineer
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Award
Project ID (if applicable): 24035MF35E01
Vendor/Entity Legal Name (if applicable): Gradient Group LLC
MWDBE Contracted Goal (if applicable): 20%
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request
Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with Gradient Group, LLC in the amount of $106,704.00 for survey, design, and construction services of a new traffic signal at the intersection of Gosling Road at Hampton Pointe Boulevard, UPIN 24035MF35E01, Precinct 3, MWDBE Contracted Goal: 20%.
end
Background and Discussion:
Traffic signals are installed to improve the operation of an intersection and better facilitate pedestrian activities. A traffic study was conducted at the intersection Gosling Road at Hampton Pointe Boulevard, warranting a traffic signal.
Expected Impact:
The installation of the new traffic signal should improve the operation of the intersection.
Alternative Options:
Intersections are evaluated in accordance with the 2011 Texas Manual on Uniform Control Devices (TMUTCD), which takes into consideration traffic volume, crashes, pedestrian activity, and the roadway network. The intersection was evaluated, and a traffic signal was warranted. One alternative option is to install a multi-way stop control at the intersection. However, this is recommended as an interim measure while arrangements are being made for the installation of a traffic signal per the TMUTCD.
Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
X Transportation
_ Flooding
_ Environment
_ Governance and Customer Service
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
09/19/2023 |
109 |
ATN Approved |
Location:
Address (if applicable): Gosling Road at Hampton Pointe Boulevard
Precinct(s): Precinct 3
|
Fiscal and Personnel Summary |
|
Service Name |
|
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
1070 - Mobility Fund |
$ |
$106,704.00 |
106,704.00 |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Current Budget |
$ |
$106,704.00 |
$106,704.00 |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Request |
$ |
$106,704.00 |
$106,704.00 |
$ |
|
Personnel (Fill out section only if requesting new PCNs) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
Anticipated Court Date: June 25th, 2024
Anticipated Implementation Date (if different from Court date):
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Patrick Mandapaka, PhD, AICP, Director of Community Resilience & Transportation Planning, HCED
Attachments (if applicable): Agreement