Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Award
Project ID (if applicable): UPIN 24102MF3HS01
Vendor/Entity Legal Name (if applicable): LJA Engineering, Inc.
MWBE Contracted Goal (if applicable): 9.25%
MWBE Current Participation (if applicable): 0%
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with LJA Engineering, Inc. in the amount of $728,252.02, for professional engineering services in connection with Roadway Improvements - South Houston - 2024, UPIN 24102MF3HS01, Precinct 2, MWBE Contracted Goal: 9.25%.
end
Background and Discussion:
Harris County Precinct 2 (PCT2) has requested that the Harris County Engineering Department (HCED) manage the design and construction of the transformation of 2 miles of a 2-lane road into a 1 lane + linear park, along South Houston Avenue G from Texas Street to 14th Street, located in Houston, Texas 77587. The goal is to provide a linear park including shared use path (5’-6’), landscape buffers, pedestrian-scale solar lights, mill and overlay, and parallel parking provision pockets. To meet Revive2Thrive vision of Precinct 2 for empowering communities and creating opportunities to existing neighborhoods, the project will design, evaluate, and analyze for roadway, drainage, traffic, shared use path and landscape buffers improvements.
Expected Impact:
This project will be contributed to incorporate linear park, pedestrian and bicycle facilities that promote safety, mobility and connectivity throughout the project limit, and to make it more pedestrian/bicycle friendly and improve the neighborhood quality of life.
Alternative Options:
If no action is taken, professional engineering services will be delayed.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: G: Expand and optimize multimodal transportation options.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): G3: Develop a bike plan to make Harris County a Gold-level Bicycle Friendly Community.
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan:
Prior Court Action (if any):
Date |
Agenda Item # |
Action Taken |
09/19/2024 |
427 (24-6014) |
Request by the Office of the County Engineer for approval to negotiate with LJA Engineering Inc for professional engineering services in connection with Roadway Improvements - South Houston - 2024, UPIN 24102MF3HS01, Precinct 2. |
Location: South Houston Avenue G
Address (if applicable): N/A
Precinct(s): Precinct 2
Fiscal and Personnel Summary |
Service Name |
Engineering |
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
Funding Sources |
|
Existing Budget |
|
|
|
|
1040 - FLEX Fund |
$ |
$728,252.02 |
$728,252.02 |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Existing Budget |
$ |
$728,252.02 |
$728,252.02 |
$ |
Additional Budget Request (Requires Fiscal Review Request Form) |
|
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Additional Budget Request |
$ |
$ |
$ |
$ |
Total Funding Sources |
$ |
$728,252.02 |
$728,252.02 |
$ |
Grants - Proposed Budget (To be filled out by Grants staff only) |
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
Personnel (Fill out section only if requesting new PCNs) |
|
Current Position Count for Service |
- |
- |
- |
- |
Additional Positions Request |
- |
- |
- |
- |
Total Personnel |
- |
- |
- |
- |
Anticipated Court Date: 4/16/2025
Anticipated Implementation Date (if different from Court date): N/A
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer
Attachments (if applicable): Professional Services Agreement