Legislation Details

File #: 25-7763    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 11/24/2025 In control: Commissioners Court
On agenda: 12/11/2025 Final action: 12/11/2025
Title: Request for approval of a change in contract with James Construction Group, LLC in connection with Bridge Construction - Greenhouse Road over Cypress Creek - K100-00-00 - 2021, with an addition in the amount of $18,014.61, Job No. 23/0323-2, UPIN 211033952830022, Precinct 3, MWBE Contracted Goal: 12%, MWBE Current Participation: 13.08%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 23/0323, UPIN 211033952830022

Vendor/Entity Legal Name (if applicable): James Construction Group, LLC

 

MWBE Contracted Goal (if applicable): 12%

MWBE Current Participation (if applicable): 13.08%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with James Construction Group, LLC in connection with Bridge Construction - Greenhouse Road over Cypress Creek - K100-00-00 - 2021, with an addition in the amount of $18,014.61, Job No. 23/0323-2, UPIN 211033952830022, Precinct 3, MWBE Contracted Goal: 12%, MWBE Current Participation: 13.08%.

end

 

Background and Discussion:

The project consists of the design and construction of the northbound bridge and approaches along Greenhouse Road over Cypress Creek.  The project limits are from 0.3 miles north of Winding Willow Oak Way to 0.3 miles south of Mound Rd which primarily consists of a bridge that is 1,800 feet in length.  This proposed bridge typical section will be a mirror image of the existing southbound bridge which is approximately 1,800 feet with 17 spans and includes a 20-foot approach slab at each end.

 

To prevent water from draining off the bridge onto the sidewalk, the drainage system was extended under the sidewalk and connected to a Type A inlet.  In addition, a retaining wall was added to protect the adjacent bank under the new bridge and along the proposed sidewalk from erosion. This change in contract will allow contractor to be properly compensated for the additional work.

 

 

 

The change in contract includes the following:

 

New Items:

•                     DRAINAGE CONNECTION TO TYPE A INLET                                          1 EA = $5,706.64

•                     RETAINING WALL CONSTRUCTION                                                                30.5 LF = $12,307.97

 

Expected Impact:

This change will allow the Contractor to be properly compensated for the additional work.

 

Alternative Options:

Conduct thorough pre-construction assessments and detailed utility mapping to identify and mitigate potential conflicts early.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

10/31/2023

319 (23-6464)

Contract Award

06/04/2024

60 (24-3108)

Contract Amendment #1 for additional funds

 

Location:

Address (if applicable): Greenhouse Road Over Cypress Creek TX 77002

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other 3002

$

$18,014.61

$18,014.61

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$18,014.61

$18,014.61

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$18,014.61

$18,014.61

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 12/11/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B