Title: Request for approval to advertise for Request for Qualifications (RFQs) for professional architectural and engineering services for design of the Washburn Tunnel Safety Enhancements - Tile Replacement project (Precinct 2; MWBE Contract Goal: 19.6%).

Primary Department: Toll Road Authority

Primary Department Head/Elected Official: Roberto Treviño, P.E., Executive Director

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Proposals/Bids

 

Project ID (if applicable): 26-6002-B; Job No. 25/0406

Vendor/Entity Legal Name (if applicable): N/A

 

MWBE Contracted Goal (if applicable): 19.6%

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to advertise for Request for Qualifications (RFQs) for professional architectural and engineering services for design of the Washburn Tunnel Safety Enhancements - Tile Replacement project (Precinct 2; MWBE Contract Goal: 19.6%).

end

 

Background and Discussion:

Washburn Tunnel completed construction in 1950.  Facility condition assessments are routinely performed on the tunnel to assess its overall condition and the condition of its elements.  As part of the assessments, it has been determined that the tile adhesion has been compromised and requires replacement. This request for advertisement for professional architectural and engineering services qualifications will allow for design for the removal and replacement of the tile and tile adhesion.  This will also allow for inspection of the tunnel liner currently covered by the tile. With Commissioners Court approval, the solicitation for qualifications will be advertised for a minimum of three weeks.

 

Expected Impact:

Identify qualified firms for the Project.

 

Alternative Options:

No other recommended solutions for this identified need.

 

County Strategic Plan Goal:  1. Make Harris County safer and more just.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H4: Consistently embed sustainability considerations in the project planning and design process.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any): N/A

Date

Agenda Item #

Action Taken

 

 

 

 

Location:

Address (if applicable): 3100 Federal Road, Houston, TX 77015

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Washburn Tunnel

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Revenue - TRA

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 1/29/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Nicole Stuttz, Chief of Staff, Harris County Toll Road Authority

 

Attachments (if applicable): N/A