Legislation Details

File #: 25-6158    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 9/30/2025 In control: Commissioners Court
On agenda: 10/16/2025 Final action: 10/16/2025
Title: Request for approval of a change in contract with Environmental Allies, Inc., in connection with Carpenters Bayou - Trails and Pedestrian Bike Bridge, adding 3 calendar days, with an addition in the amount of $10,309.91, Job No. 24/0107-1, UPIN 19101MF0YC01, Precincts 1 and Precinct 2, MWBE Contracted Goal: 23%, MWBE Current Participation: 19.28%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 24/0107, UPIN 19101MF0YC01

Vendor/Entity Legal Name (if applicable): Environmental Allies, Inc.

 

MWBE Contracted Goal (if applicable): 23%

MWBE Current Participation (if applicable): 19.28%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Environmental Allies, Inc., in connection with Carpenters Bayou - Trails and Pedestrian Bike Bridge, adding 3 calendar days, with an addition in the amount of $10,309.91, Job No. 24/0107-1, UPIN 19101MF0YC01, Precincts 1 and Precinct 2, MWBE Contracted Goal: 23%, MWBE Current Participation: 19.28%.

end

 

Background and Discussion:

The project consists of the construction of a 10 feet wide trail and single span, prefabricated pedestrian bridge spanning Carpenters Bayou.  Limits of the project are from Flintcrest Drive to Aguirre Middle School.

 

At Carpenters Landing/Wallisville Road, Sta. 600+00, the Type E-Inlet is located 2 feet inside the proposed sidewalk.  The inlet cannot be adjusted due to the existing drainage.  Per engineer of record direction, the inlet top must be adjusted to match ramp landing and sidewalk grades, with a culvert installed to maintain drainage flow.  This correction is required under TDLR specifications to eliminate safety hazards.  This change will add an additional cost of $10,309.91 and an additional 3 days.

 

Expected Impact:

Increase the total cost for the contract and add additional days to the contract time.

 

 

Alternative Options:

No action will result in substandard construction.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F1: Strengthen the County’s commitment to Vision Zero principles and goals.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

06/25/2024

284 (24-3827)

Contract Award

09/18/2025

375 (25-5728)

Substantial Completion

 

Location:

Address (if applicable):

Precinct(s): Precincts 1 & 2

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other 3103, 1070

$

$10,309.91

$10,309.91

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$10,309.91

$10,309.91

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$10,309.91

$10,309.91

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 10/16/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B