Legislation Details

File #: 26-2224    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 3/31/2026 In control: Commissioners Court
On agenda: 4/16/2026 Final action: 4/16/2026
Title: Request for approval of a change in contract with TWL, LLC in connection with Connectivity Project - Curtis M Graves - 2020, adding 66 calendar days, with an addition in the amount of $296,139.33 Job No. 24/0413-1, UPIN 20101MF1JE01, Precinct 1, MWBE Contracted Goal: 16%, MWBE Current Participation: 26.61%.
Attachments: 1. 26-2224-CIC-20101MF1JE01-Curtis M Graves-24-0413-1-TWL LLC-P1-04162026

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No: 24/0413, UPIN 20101MF1JE01

Vendor/Entity Legal Name (if applicable): TWL, LLC

 

MWBE Contracted Goal (if applicable): 16%

MWBE Current Participation (if applicable): 26.61%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with TWL, LLC in connection with Connectivity Project - Curtis M Graves - 2020, adding 66 calendar days, with an addition in the amount of $296,139.33 Job No. 24/0413-1, UPIN 20101MF1JE01, Precinct 1, MWBE Contracted Goal: 16%, MWBE Current Participation: 26.61%.

end

 

Background and Discussion:

The County advertised Homestead Detention Basin Trail and Amenities project for bid and now seeks to award the construction contract based on the lowest and responsive bidder.  The goal of constructing the subject project is to construct approximately 6,900 linear feet of 10’ wide concrete trail along the top of the bank of Homestead Detention Pond.  The project also includes the construction of a concrete driveway, 12-space parking lot, and park site amenities.

 

Expected Impact:

This action will allow TWL, LLC to proceed with the construction of the project.

 

Alternative Options:

If no action is taken, the construction of the project will not be completed.

 

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: G: Expand and optimize multimodal transportation options.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  I1: Develop a countywide parks network and connectivity plan.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N3: Promote increased physical activity of residents.

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

02/27/2025

119 (25-1208)

Contract Award

 

Location:

Address (if applicable):

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund 3109

$

$296,139.33

$296,139.33

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$296,139.33

$296,139.33

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$296,139.33

$296,139.33

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 4/16/2026

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B