Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: Commissioner, Precinct 3
Secondary Department Head/Elected Official:
Regular or Supplemental RCA: Regular RCA
Type of Request: Asset Management
Project ID (if applicable): RPD-NP-090
Vendor/Entity Legal Name (if applicable): CenterPoint Energy Houston Electric, LLC
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval for the sale by Harris County Flood Control District of a 10’ wide electric easement which is shown by the dot-dash symbol on Plat Nos. 24-0124, and 24- 0124A, attached hereto and made a part hereof, together with unobstructed aerial easements ten (10) feet wide, beginning at a plane sixteen (16) feet above the ground and extending upward, located on both sides of and adjoining said ten (10) foot wide easement and part of a 36.6404-acre tract of land out of the residue of a 1376- acre tract in the George Fisher Survey, Abstract 264, Harris County, Texas to CenterPoint Energy Houston Electric, LLC from HCFCD General Sales J100-00-00-07-601.0, for the appraised value of $8,697.00, and that the County Judge execute the electric easement, UPIN RPD-NP-090, Precinct 3.
end
Background and Discussion:
Sale of a 10' to 30' wide aerial easement to CenterPoint will allow for maintenance of distribution facilities across a portion of Spring Creek. Sale of electric easement will allow CenterPoint Energy to place powerlines within Harris County and Harris County Flood Control District right of way.
Expected Impact:
This proposal would allow for the residential development of a master planned community of Breckenridge Forest which would add significantly to the Harris County tax base.
Alternative Options:
Alternative routes will have greater impact on existing public infrastructure.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): N/A
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan:
Prior Court Action (if any): None
|
Date |
Agenda Item # |
Action Taken |
|
|
|
|
Location:
Address (if applicable): East of Cypresswood Drive and West of Spring Creek Spring, Texas 77373
Precinct(s): Precinct 3
|
Fiscal and Personnel Summary |
|
Service Name |
|
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Tax Revenue - FCD |
$ |
($8,697.00) |
($8,697.00) |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
($8,697.00) |
($8,697.00) |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
($8,697.00) |
($8,697.00) |
$ |
|
Grants - Proposed Budget (To be filled out by Grants staff only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
|
Personnel (Fill out section only if requesting new PCNs) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
Anticipated Court Date: 2/6/2025
Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Michael Ware, Director, Real Property Division
Attachments (if applicable): Electric Easement with Exhibits and Map