Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: Not applicable
Regular or Supplemental RCA: Regular RCA
Type of Request: Public Necessity
Project ID (if applicable): 24103MF3HD01
Vendor/Entity Legal Name (if applicable): Any applicable landowner and/or property interest holder
MWBE Contracted Goal (if applicable): Not applicable
MWBE Current Participation (if applicable): Not applicable
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): Not applicable
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a certain project, decreeing the project to be a public necessity and convenience, and directing the Harris County Real Property Division to acquire, one (1) drainage easement tract for the public project known as Subdivision Drainage Improvements - Lakeshore - 2024, for the purpose of drainage improvements, UPIN 24103MF3HD01, Precinct 3.
end
Background and Discussion:
The existing drainage system is a curb and gutter residential with underground storm sewer. The entirety of Lakeshore Section 1 drains to Lakeshore Landing Drive to a large reinforced concrete box that outfalls to G103-55-00 and ultimately Lake Houston.
• The primary drainage issue is that a section of Elm Shores Drive experiences frequent street ponding that adversely affects residents on the east side of the street.
• These homes flooded during Hurricane Harvey and experienced garage flooding during Imelda and have continued to experience garage flooding damages.
Precinct expectations:
• The recommended solution involves the addition of a storm sewer along Elm Shores Drive with a new outfall near the corner of Elm Shores Dr. and Cedar Shores Dr.
• The scope of work is to design the recommended storm sewer and obtain a drainage or storm sewer easement. The design shall include site restoration within the proposed easement.
Expected Impact:
This project aligns with Harris County’s goals of providing accessible, affordable, equitable, reliable, safe and sustainable drainage options and will provide these residents relief from structural damages during excessive rain events.
Alternative Options:
No other recommended solutions for this identified need.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: N/A
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): N/A
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan:
Prior Court Action (if any): None
|
Date |
Agenda Item # |
Action Taken |
|
|
|
|
Location:
Address (if applicable): 0 Maple Shores Drive, Houston, TX 77044
Precinct(s): Precinct 3
|
Fiscal and Personnel Summary |
|
Service Name |
|
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
$ |
$ |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
$ |
$ |
$ |
|
Grants - Proposed Budget (For Grants Items only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
|
Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
|
County Attorney’s Office Legal Review (for Harris County Code Items only) |
|
CAO Reviewer Name and Title |
|
CAO Review Completion Date |
Click or tap to enter a date. |
Anticipated Court Date: 1/8/2026
Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Dr. F. Mike Etienne, Chief of Planning and Development Services, Office of the County Engineer
Attachments (if applicable): Findings and Declarations; Metes and Bounds