Harris County Logo
File #: 24-0858    Version: 1 Name:
Type: Negotiation Status: Passed
File created: 2/12/2024 In control: Commissioners Court
On agenda: 2/27/2024 Final action: 2/27/2024
Title: Request for approval to negotiate with Ninyo & Moore for Professional Engineering Services regarding construction materials testing and related services for Hiram Clarke Road from Summerlyn Drive to Anderson Road, UPIN 19101MF0ZE01, Precinct 1.

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Negotiation

 

Project ID (if applicable): 19101MF0ZE01

Vendor/Entity Legal Name (if applicable): Ninyo & Moore

 

MWDBE Contracted Goal (if applicable): N/A

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - Goal not applicable to request

 

Request Summary (Agenda Caption):

title

Request for approval to negotiate with Ninyo & Moore for Professional Engineering Services regarding construction materials testing and related services for Hiram Clarke Road from Summerlyn Drive to Anderson Road, UPIN 19101MF0ZE01, Precinct 1.

end

 

Background and Discussion:

This project is located in south Harris County, inside Beltway 8. Hiram Clarke is a proposed Major Throughfare on the Major Throughfare and Freeway Plan. The scope and proposed improvements include construction of a four-lane concrete boulevard roadway with storm sewer from approximately 900-feet south of Anderson Road to the Anderson Road intersection. New sidewalk is proposed on both sides of Hiram Clarke Road from Anderson Road at the north and to Summerlyn Drive at the south. Construction materials testing services are needed to support the project during construction.

 

Expected Impact:

This agreement will allow the firm to conduct field and laboratory testing on soil, concrete, asphalt, and other various construction materials to ensure the material’s compliance with Harris County Engineering Department’s adopted standards and specifications as required by state law.

 

Alternative Options:

 

Construction materials testing is required by state law.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

X Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

11/09/21

25

Professional Engineering Services

11/29/22

47

Professional Engineering Services Amendment

 

Location:

Address (if applicable):

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Professional Services - CMT

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$

$

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: February 27, 2024

Anticipated Implementation Date (if different from Court date):

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Dr. Hatem Bastawisy, P.E., Senior Director of Project Deliver, HCED

 

Attachments (if applicable): N/A