Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Award
Project ID (if applicable): UPIN: 24102MF3KM01
Vendor/Entity Legal Name (if applicable): Entech Civil Engineers, Inc.
MWBE Contracted Goal (if applicable): 19.835%
MWBE Current Participation (if applicable): 0.0%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with Entech Civil Engineers, Inc. in the amount of $2,683,000.00 for Professional Engineering Services in connection with the Fairmont Parkway - 1 - From Red Bluff to 700' West of Canada Drive - 2024 project and design coordination for Segments 2, 3 & 4 for Fairmont Parkway Improvements, UPIN 24102MF3KM01, Precinct 2, MWBE Contracted Goal: 19.835%.
end
Background and Discussion:
Fairmont Parkway Segment 1 is part of a four-segment project that includes constructing an additional outside lane in each direction, repair and/or overlay of existing pavement, adding new sidewalks and improve drainage. The project also includes replacement of the bridges at Willow Springs Bayou to accommodate the additional lanes and pedestrian traffic. A portion of the project is in the City of Pasadena and City of La Porte.
Expected Impact:
This project seeks to improve transportation and pedestrian mobility by improving road conditions to enhance traffic flow and provide smoother and safer travel for motorists, while also creating a pedestrian-friendly environment by constructing sidewalks, promoting active transportation, and improving overall pedestrian access.
Alternative Options:
The County could elect to fund the requested task or choose to reject it. However, if not approved, the consultant will not be able to complete the scope of work.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): F1: Strengthen the County’s commitment to Vision Zero principles and goals.
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan:
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
06/04/2024 |
149 (24-3444) |
Request for approval to negotiate with Entech Civil Engineers, Inc. for professional engineering design services in connection with Fairmont Parkway Improvements Segment 1 from Red Bluff Road to 700 feet West of Canada Drive and design coordination for Segment 2, 3 & 4 for Fairmont Parkway Improvement from Red Bluff Road to S.H. 146 South, UPIN 24102MF34H01, Precinct 2. |
Location: Fairmont Parkway - From Red Bluff to 700' West of Canada Drive
Address (if applicable): N/A
Precinct(s): Precinct 2
|
Fiscal and Personnel Summary |
|
Service Name |
Engineering |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Other Fund 3109 |
$ |
$2,683,000 |
$2,683,000 |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
$2,683,000 |
$2,683,000 |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
$2,683,000 |
$2,683,000 |
$ |
|
Grants - Proposed Budget (To be filled out by Grants staff only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
|
Personnel (Fill out section only if requesting new PCNs) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
Anticipated Court Date: 3/27/2025
Anticipated Implementation Date (if different from Court date): N/A
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer
Attachments (if applicable): Professional Services Agreement