Title: Request for approval to execute an agreement with Walter P. Moore and Associates, Inc. in the amount of $726,015.55 for Professional Engineering Services in connection with Hike and Bike Trail - Russ Poppe Park to Cypress Park - 2025, UPIN 25103MF3VG01, Precinct 3, MWBE Contracted Goal: 21.99%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

 

Type of Request: Contract - Award

 

Project ID (if applicable): UPIN 25103MF3VG01

Vendor/Entity Legal Name (if applicable): Walter P. Moore & Associates, Inc.

 

MWBE Contracted Goal (if applicable): 21.99%

MWBE Current Participation (if applicable): 0%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute an agreement with Walter P. Moore and Associates, Inc. in the amount of $726,015.55 for Professional Engineering Services in connection with Hike and Bike Trail - Russ Poppe Park to Cypress Park - 2025, UPIN 25103MF3VG01, Precinct 3, MWBE Contracted Goal: 21.99%.

end

 

Background and Discussion:

 

The County engaged Walter P. Moore & Associates, Inc. in 2024, and now seeks Walter P. Moore & Associates, Inc. to facilitate the design of a 12-foot-wide asphalt trail between Russ Poppe Park to Cypress Park.  The asphalt trail will transition to a concrete pedestrian undercrossing below North Eldridge Parkway.  The project will also include the design of a pedestrian bridge at K100-00-00 (Cypress Creek), and the addition of approximately 20 parking spaces at Cypress Park. 

 

Expected Impact:

 

Executing the agreement will allow the firm to proceed with the study and design of a parking lot addition at Cypress Park, and an asphalt trail, pedestrian undercrossing, and pedestrian bridge between Russ Poppe Park to Cypress Park. 

 

 

Alternative Options:

 

The alternative is to not design the parking lot addition, asphalt trail, pedestrian undercrossing or pedestrian bridge, and leave the existing undeveloped areas as-is between Russ Poppe Park to Cypress Park.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F1: Strengthen the County’s commitment to Vision Zero principles and goals.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

01/09/2025

376 (25-0414)

24/0334 (Roadway) – RFSQ approved on court agenda

 

 

 

 

 

 

 

Location:

Address (if applicable): Hike and Bike Trail - Russ Poppe Park to Cypress Park

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Professional Engineering Services

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Bonds                     3269

$

$726,015.55

$726,015.55

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$726,015.55

$726,015.55

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$726,015.55

$726,015.55

$

Grants – Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget:

Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request:

Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 9/18/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services,

Office of the County Engineer

 

Attachments (if applicable): Contract Exhibits and Agreement