Legislation Details

File #: 25-6156    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 9/30/2025 In control: Commissioners Court
On agenda: 10/16/2025 Final action: 10/16/2025
Title: Request for approval of a change in contract with Allgood Construction Co., Inc., in connection with West Gulf Bank Road from I45 to Airline Drive, with an addition in the amount of $41,383.48, Job No. 22/0461-9, UPIN 19101MF0XV01, Precinct 2, MWBE Contracted Goal: 25%, MWBE Current Participation: 38.76%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 22/0461, UPIN 19101MF0XV01

Vendor/Entity Legal Name (if applicable): Allgood Construction Co., Inc.

 

MWBE Contracted Goal (if applicable): 25%

MWBE Current Participation (if applicable): 38.76%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Allgood Construction Co., Inc., in connection with West Gulf Bank Road from I45 to Airline Drive, with an addition in the amount of $41,383.48, Job No. 22/0461-9, UPIN 19101MF0XV01, Precinct 2, MWBE Contracted Goal: 25%, MWBE Current Participation: 38.76%.

end

 

Background and Discussion:

This project includes the construction of four 11-foot-wide concrete pavements with a 24-foot median, and an 8-foot-wide sidewalk along both sides West Gulf Bank Road from Interstate 45 Freeway to Airline Drive.  It also includes drainage improvements.

 

This change includes the following:

-                     The address 9004 North Fwy, Houston, TX 77092 is part of the overall project.  The riser at this location was not relocated during the initial CenterPoint pole relocation, requiring new wire installation from the relocated riser to the building. When CenterPoint attempted to install the meter, the building was red-tagged due to the existing meter being out of compliance with the new wire. A generator was required, and the meter was replaced to bring the system into compliance. This change adds an additional $22,618.70 and no additional days.

-                     The conduit and cable charts for the proposed traffic signal intersections had blank 1" conduit lines on two of the three signals. The Engineer of Record concurred and issued revised plans for all three intersections. This revision added additional cost to bid items 149 and 150. This change adds an additional $18,764.78 and no additional days.

 

Expected Impact:

Increase the total cost for the contract.

 

Alternative Options:

No action will result in substandard construction.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F1: Strengthen the County’s commitment to Vision Zero principles and goals.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

03/14/2023

217 (23-1522)

Contract Award

10/10/2023

54 (23-6079)

Contract Amendment #1 for additional funds and extension of project term

01/09/2024

19 (24-0214)

Contract Amendment #2 for additional funds and extension of project term

06/04/2024

65 (24-2906)

Contract Amendment #3 for additional funds and extension of project term

08/06/2024

61 (24-4705)

Contract Amendment #4 for additional funds and extension of project term

11/12/2024

65 (24-7204)

Contract Amendment #5 for extension of project term

11/12/2024

66 (24-7205)

Contract Amendment #6 for additional funds and extension of project term

03/27/2025

103 (25-2024)

Contract Amendment #7 for additional funds and extension of project term

08/07/2025

67 (25-4548)

Contract Amendment #8 for additional funds and extension of project term

 

Location:

Address (if applicable):

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other 3021, 3109, 3269

$

$41,383.48

$41,383.48

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$41,383.48

$41,383.48

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$41,383.48

$41,383.48

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 10/16/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B