File #: 25-3427    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 5/27/2025 In control: Commissioners Court
On agenda: 6/12/2025 Final action: 6/12/2025
Title: Request for approval of a change in contract with Sequeira Civil Construction, LLC, in connection with final construction of Schiel Road 2 - from West of Fairfield Place Drive to West of Mason Road, adding 8 calendar days, with a deduction in the amount of $475,913.57, Job No. 23/0239-3, UPIN 18103N302203, Precinct 3, MWBE Contracted Goal: 32%, MWBE Current Participation: 100%.

Primary Department: County Engineer

Primary Department Head/Elected Official:  Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 23/0239, UPIN 18103N302203

Vendor/Entity Legal Name (if applicable): Sequeira Civil Construction, LLC

 

MWBE Contracted Goal (if applicable): 32%

MWBE Current Participation (if applicable): 100%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Sequeira Civil Construction, LLC, in connection with final construction of Schiel Road 2 - from West of Fairfield Place Drive to West of Mason Road, adding 8 calendar days, with a deduction in the amount of $475,913.57, Job No. 23/0239-3, UPIN 18103N302203, Precinct 3, MWBE Contracted Goal: 32%, MWBE Current Participation: 100%.

end

 

Background and Discussion:

Project included the reconstruction of Schiel Road 2 - from West of Fairfield Place Drive to West of Mason Road. Reconstruction includes an upgrade of the roadway from a two-lane asphalt road with open ditches to a 4-lane concrete curb and gutter boulevard with a 32' raised median.

 

The change in contract includes the following:

                     Install Sign                                                                                                                                                    $765.00

                     Install Flag and Flags Bracket                                                                                                         $2,209.90

                     Install Temporary Post                                                                                                         $1,035.32

                     Remove and Replace School Zone Speed Signs                                          $3,397.00

                     The final adjustment (reconciliation of actual quantities used in construction against the bid quantities). (-$475,913.57).

 

 

Expected Impact:

Change allows unused funds to be returned to Harris County and allows the Contractor to be compensated.

 

Alternative Options:

Maintain the original scope of the project.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

08/08/2023

273 (23-4491)

Contract Award

06/04/2024

64 (24-3050)

Contract Amendment #1 for additional funds and extension of project term

09/19/2024

47 (24-5800)

Contract Amendment #2 for additional funds and extension of project term

01/09/2025

318 (25-0364)

Substantial Completion

 

Location:

Address (if applicable): Schiel Road 2 - from West of Fairfield Place Drive to West of Mason Road

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other 3109

$

-$475,913.57

-$475,913.57

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

-$475,913.57

-$475,913.57

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

-$475,913.57

-$475,913.57

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 6/12/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B