Legislation Details

File #: 25-6163    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 9/30/2025 In control: Commissioners Court
On agenda: 10/16/2025 Final action: 10/16/2025
Title: Request for approval of a change in contract with Traffic Systems Construction, Inc., in connection with final construction of Intersection Improvement - Mason Road at Highland Knolls Drive - 2022, adding 219 calendar days, with an addition in the amount of $83,969.71, Job No. 23/0177-1, UPIN 22104MF2JU01, Precinct 4, MWBE Contracted Goal: 30%, MWBE Current Participation: 68.77%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 23/0177, UPIN 22104MF2JU01 

Vendor/Entity Legal Name (if applicable): Traffic Systems Construction, Inc.

 

MWBE Contracted Goal (if applicable): 30%

MWBE Current Participation (if applicable): 68.77%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Traffic Systems Construction, Inc., in connection with final construction of Intersection Improvement - Mason Road at Highland Knolls Drive - 2022, adding 219 calendar days, with an addition in the amount of $83,969.71, Job No. 23/0177-1, UPIN 22104MF2JU01, Precinct 4, MWBE Contracted Goal: 30%, MWBE Current Participation: 68.77%.

end

 

Background and Discussion:

Project includes construction of intersection improvements including additional left turn lanes, dedicated right turn lanes, pedestrian crossing improvements with ADA ramps, additional sidewalks, traffic signal modifications, etc.

 

The final change order is to add 219 days that were delays caused by outside factors including limited working times dictated by Precinct along with delayed inspections from Traffic for signal modifications.  This intersection is one of six intersections that were awarded as a package and all 6 intersections had separate Purchase Orders. This causes all 6 to run concurrently per the award of the contract.  All 6 intersections experienced the same delays thus resulting in the addition of time to the contract as a whole on all 6 final Pay Estimates.

 

The final dollar amount added to the contract is for overruns per the original scope.  No new items were added.

 

 

Expected Impact:

This final change order allows for the final payment of work completed to the contractor and will effectively close the project.

 

Alternative Options:

No alternative options.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

10/31/2023

318 (23-6468)

Contract Award

 

Location:

Address (if applicable):

Precinct(s): Precinct 4

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund

$

$83,969.71

$83,969.71

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$83,969.71

$83,969.71

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$83,969.71

$83,969.71

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 10/16/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B