Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): Job No. 23/0340, UPIN 20103N302902
Vendor/Entity Legal Name (if applicable): Sapo Engineering Consultants
MWBE Contracted Goal (if applicable): 32%
MWBE Current Participation (if applicable): 100%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of a change in contract with Sapo Engineering Consultants, in connection with final construction of Sidewalks and Undercrossing Project - Huffmeister, adding 61 calendar days, with a deduction in the amount of $28,815.79, Job No. 23/0340-1, UPIN 20103N302902, Precinct 3, MWBE Contracted Goal: 32%, MWBE Current Participation: 100%.
end
Background and Discussion:
The project involves the construction of a 5-foot-wide concrete sidewalk, featuring wheelchair ramps at all public street intersections, properly sloped driveways, and retaining walls as needed to address steep grades behind the curb. Oversight was provided by the Harris County Office of the County Engineer’s CPD team.
Changes include reconciliation of actual quantities used in construction with the estimated quantities included for bidding purposes.
- PCO - 4, A total of 10 additional calendar days have been granted, including 4 days for water pump issues caused by another contractor’s flooding of formwork, 3 days for delays due to Hurricane Beryl, and 3 days for continuous rain events.
- PCO - 5, An additional 5 days are being requested to adjust the traffic pull box in preparation for the sidewalk pour.
- PCO - 6, An additional 46 days were granted due to insufficient planning and execution.
- PCO - 7, Final Adjustment $28,815.79
Expected Impact:
Changes allow for addition of new bid items to complete the project in accordance with the original intent of the project and in compliance with precinct requests.
Alternative Options:
No alternative options.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): G1: Expand pedestrian and cyclist infrastructure on County-managed roads,
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan: N/A
Prior Court Action (if any):
Date |
Agenda Item # |
Action Taken |
01/30/2024 |
310 (24-0488) |
Contract Award |
Location:
Address (if applicable): 11507 Huffmeister Rd, Houston, TX 77065
Precinct(s): Precinct 3
Fiscal and Personnel Summary |
Service Name |
Engineering |
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
Funding Sources |
|
Existing Budget |
|
|
|
|
Other 2601 |
$ |
-$28,815.79 |
-$28,815.79 |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
-$28,815.79 |
-$28,815.79 |
$ |
Total Existing Budget |
$ |
$ |
$ |
$ |
Additional Budget Request (Requires Fiscal Review Request Form) |
|
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Additional Budget Request |
$ |
$ |
$ |
$ |
Total Funding Sources |
$ |
-$28,815.79 |
-$28,815.79 |
$ |
Grants - Proposed Budget (To be filled out by Grants staff only) |
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
Personnel (Fill out section only if requesting new PCNs) |
|
Current Position Count for Service |
- |
- |
- |
- |
Additional Positions Request |
- |
- |
- |
- |
Total Personnel |
- |
- |
- |
- |
Anticipated Court Date: 5/8/2025
Anticipated Implementation Date (if different from Court date): N/A
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer
Attachments (if applicable): County Auditor’s Form 1258B