Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV-SP, County Engineer
Secondary Department: Choose an item.
Secondary Department Head/Elected Official:
Regular or Supplemental RCA: Regular RCA
Type of Request: Report
Project ID (if applicable): UPIN 19103MF12K01
Vendor/Entity Legal Name (if applicable): Amani Engineering Inc.
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - project was awarded prior to launch of County's M/WBE Program
Grant Indirect Costs Rate (if applicable):
Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.
Request Summary (Agenda Caption):
title
Request for approval of a study report prepared by Amani Engineering Inc., for Tower Oaks Meadows Subdivision Drainage Improvements - 2018, UPIN 19103MF12K01, Precinct 3.
end
Background and Discussion:
The project area is located in the Northwest area bounded by Barwood Subdivision on the North, N Eldridge Pkwy on the East, Fallbrook Dr on the South, and Marrs Dr on the West. The subdivision is specifically bounded on the West by HCFCD Unit E133-00-00, on the East by HCFCD Unit E132-00-00. The Tower Oaks Meadows Subdivision primarily served by roadside ditch drainage systems that are directed East to N Eldridge Pkwy, West to HCFCD Unit E133-00-00 and North to an existing storm sewer within a back lot easement on the common line between Tower Oaks Meadows and Barwood Subdivision. The scope of work for this project consists of storm sewer improvements by regrading ditches and providing additional capacity underneath ditches to accommodate for increased conveyance, and full roadway reconstruction in the subdivision.
Expected Impact:
This project seeks to reduce flood risk and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the community. This modification is a step in the process to reduce the financial, physical, and emotional burden flood damage places on homeowners and will reduce the financial impact of recovery costs to the Tower Oaks Meadows Project area and surrounding bond program subdivision homeowners, Harris County, and FEMA.
Alternative Options:
N/A
County Strategic Plan Goal: 5. Minimize the impact of climate change and disasters.
County Strategic Plan Objective: R: Enhance disaster preparedness, response, recovery, and resiliency.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): H6: Expand neighborhood drainage programs.
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan:
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
3/30/21 |
78 |
Authorization to Negotiate for Engineering Services |
|
06/29/21 |
70 |
Contract Award for Professional Engineering Services |
|
02/8/22 |
35 |
Amendment 1 |
|
11/15/22 |
49 |
Amendment 2 |
Location: Tower Oaks Meadows Subdivision
Address (if applicable): N/A
Precinct(s): Precinct 3
|
Fiscal and Personnel Summary |
|
Service Name |
Professional Engineering Services |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Choose an item. |
$ |
$0.00 |
$0.00 |
$ |
|
Other |
$ |
$0.00 |
$0.00 |
$ |
|
Total Existing Budget |
$ |
$0.00 |
$0.00 |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
$0.00 |
$0.00 |
$ |
|
Grants - Proposed Budget (For Grants Items only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
|
Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
|
County Attorney’s Office Legal Review (for Harris County Code Items only) |
|
CAO Reviewer Name and Title |
|
CAO Review Completion Date |
Click or tap to enter a date. |
Anticipated Court Date: 3/19/2026
Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer
Attachments (if applicable): Study Report