Legislation Details

File #: 26-4150    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 6/23/2026 In control: Commissioners Court
On agenda: 7/9/2026 Final action: 7/9/2026
Title: Request for approval of a change in contract with Spawglass Construction Corp. in connection with Challenger 7 Improvements, adding 215 calendar days, with an addition in the amount of $65,865.78, Job No. 24/0264-4, UPIN 20101MF1F101, Precinct 2, MWBE Contracted Goal: 41%, MWBE Current Participation: 42.85%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 24/0264, UPIN 20101MF1F101

Vendor/Entity Legal Name (if applicable): Spawglass Construction Corp.

 

MWBE Contracted Goal (if applicable): 41%

MWBE Current Participation (if applicable): 42.85%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Spawglass Construction Corp. in connection with Challenger 7 Improvements, adding 215 calendar days, with an addition in the amount of $65,865.78, Job No. 24/0264-4, UPIN 20101MF1F101, Precinct 2, MWBE Contracted Goal: 41%, MWBE Current Participation: 42.85%.

end

 

Background and Discussion:

Challenger 7 Park - Boardwalk Renovation project includes work in three distinct areas.  The existing boardwalk area will include removal of the existing boardwalk and replacement with a new structure.  Learning components including an immersive classroom, outdoor classroom, and areas for future signage will be identified.  The project also contains the addition of a trailhead with bike parking.  The area near the boat ramp will be repurposed to include additional walking trails, seating area, floating kayak launch, and planting.

 

The Changes in contract include:

•                     Adding a new line item is needed to adjust the 6-inch drainpipe at Rocketship entrance to address the flow of water with additional cost of $3,951.19 and zero calendar days.

•                     Adding a new line item to install 22 Inches I-Beam at overlook Pavillion to support the WC with additional costs of $2,555.3 and zero calendar days.

•                     Adding a new line item to address the findings and connection of irrigation line with the proposed waterline at additional cost of $3,530.75 and 1 calendar day.

•                     Adding of optional item of bid (Add Alternate 1 - Free Standing Shade Structure - 14' x 14' Including Foundation) per field condition and Precinct recommendation with additional cost of $55,828.54 and 214 calendar days.

 

Expected Impact:

The change will allow the contractor to complete the proposed work according to the design plan and complete the project.

 

Alternative Options:

There is no other alternative available except the requested changes will allow the contractor to complete the proposed work according to the design plan and complete the project.

 

County Strategic Plan Goal:  N/A

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

10/29/2024

357 (24-6863)

Contract Award

08/07/2025

69 (25-4550)

Contract Amendment for additional funds

09/18/2025

26 (25-5603)

Contract Amendment for additional funds

01/08/2026

31(26-0181)

Contract Amendment for additional funds and extension of project term

 

Location:

Address (if applicable): Various Locations

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund 3239, 2699, 2602

$

$65,865.78

$65,865.78

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$65,865.78

$65,865.78

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

1070 - Mobility Fund

$

$

 

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$65,865.78

$65,865.78

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 7/9/2026

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B

.