Legislation Details

File #: 24-0686    Version: 1 Name:
Type: Negotiation Status: Passed
File created: 1/23/2024 In control: Commissioners Court
On agenda: 1/30/2024 Final action: 1/30/2024
Title: Request for approval to negotiate with Entech Civil Engineers, Inc. for Professional Engineering Services in connection with the Sidewalk - Energy Corridor and MultiModal Connectivity project, UPIN 24104MF38Q01, Precinct 4.

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Negotiation

 

Project ID (if applicable): 24104MF38Q01

Vendor/Entity Legal Name (if applicable): Entech Civil Engineers, Inc.

 

MWDBE Contracted Goal (if applicable): N/A

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - Goal not applicable to request

 

Request Summary (Agenda Caption):

title

Request for approval to negotiate with Entech Civil Engineers, Inc. for Professional Engineering Services in connection with the Sidewalk - Energy Corridor and MultiModal Connectivity project, UPIN 24104MF38Q01, Precinct 4.

end

 

Background and Discussion:

The consultant will provide the Study and design documents for the project, Project consists of the proposed sidewalks throughout the Energy Corridor District summarized as follows:

1.                     Park Row Drive - State Highway 6 to North Eldridge Parkway (1.7 miles).

2.                     North Dairy Ashford Road - N. Eldridge Parkway Intersection to IH-10 (0.8 miles).

3.                     Dairy Ashford Road - IH-10 to Memorial Drive (1.0 miles).

4.                     Six Intersection Safety Enhancements - At connected corridors, including two major intersection reconstructions at SH-6 at Park Row and Park Row at Eldridge Parkway will include high visibility crosswalks.. 

   

Expected Impact:

Project is needed to provide alternative mobility and connectivity options for park, school and neighborhood pedestrian and bicycle mobility and connectivity.

 

Alternative Options:

If no action is taken, existing conditions will continue.

 

Alignment with Goal(s):

   Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

_ Flooding

_ Environment

_ Governance and Customer Service

 

 

Prior Court Action (if any): N/A

 

Date

Agenda Item #

Action Taken

 

 

 

 

Location:

Address (if applicable):

Precinct(s): Precinct 4

 

Fiscal and Personnel Summary

Service Name

Roadway Construction

 

FY 24

FY 25

Next 3 FYs

Incremental Expenditures (do NOT write values in thousands or millions)

Labor Expenditures

$

$

$

Non-Labor Expenditures

$

$

$

Total Incremental Expenditures

$

$

$

Funding Sources (do NOT write values in thousands or millions)

Existing Budget

Choose an item.

$

$

$

Choose an item.

$

$

$

Choose an item.

$

$

$

Total Current Budget

$

$

$

Additional Budget Requested

Choose an item.

$

$

$

Choose an item.

$

$

$

Choose an item.

$

$

$

Total Additional Budget Requested

$

$

$

Total Funding Sources

$

$

$

Personnel (Fill out section only if requesting new PCNs)

Current Position Count for Service

-

-

-

Additional Positions Requested

-

-

-

Total Personnel

-

-

-


Anticipated Court Date: January 30, 2024

Anticipated Implementation Date (if different from Court date):

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

Contact(s) name, title, department: Dr. Hatem Elbastawisy, PE, (Interim) Senior Director of Project Delivery, Harris County Engineering Department

Attachments (if applicable): N/A