Legislation Details

File #: 25-0853    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 1/24/2025 In control: Commissioners Court
On agenda: 2/6/2025 Final action: 2/6/2025
Title: Request for approval of a Professional Services Agreement with BGE Inc. for Construction Phase Services in the amount of $249,573.00 in connection with Cedar Bayou Park East and West Subdivision Drainage Improvements - 2018, UPIN 19102MF15W01, Precinct 2, MWBE Contracted Goal: 11.316%.
Attachments: 1. 25-0853-Consultant-UPIN 19102MF15W01-Cedar Bayou-BGE-P2-02062025

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official:

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): UPIN 19102MF15W01

Vendor/Entity Legal Name (if applicable): BGE Inc.

 

MWBE Contracted Goal (if applicable): 11.316%

MWBE Current Participation (if applicable): 0%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable):N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a Professional Services Agreement with BGE Inc. for Construction Phase Services in the amount of $249,573.00 in connection with Cedar Bayou Park East and West Subdivision Drainage Improvements - 2018, UPIN 19102MF15W01, Precinct 2, MWBE Contracted Goal: 11.316%.

end

 

Background and Discussion:

The project is located in Baytown, TX, approximately 1.2 miles south of Interstate Highway 10 and 0.1 miles west of the Harris County line. Cedar Bayou Park East and West drains by roadside ditches with some intermittent storm sewers. The major drainage system collector is Harris County Flood Control District (HCFCD) channel Q13-00-00 which drains the neighborhood from Sjolander to the outfall location at Bayou Boulevard. The proposed improvements in the subdivision are to regrade roadside ditches, install storm sewer beneath ditches, construct driveways and driveway culverts, and construct a storm water detention basin. The additional funds will cover the construction phase services agreement to allow for construction oversight of the project.

 

Expected Impact:

This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the Cedar Bayou subdivision. Engineering support during the construction of the improvements is a step in the process to reduce the financial, physical, and emotional burden flood damage places on homeowners and will reduce the financial impact of recovery costs to the Cedar Bayou Subdivision area, Harris County, and FEMA. The fiscal impact for this project will come from the 1070 Mobility Fund with the long-term goal of reducing drainage costs in the future. No impact to project schedule or staffing anticipated.

Alternative Options:

The County could elect to fund the requested task or choose to reject it.  However, if not approved, the project may not be constructed as engineered. As a result, the community may continue to experience flooding in the subdivision.

County Strategic Plan Goal:  5. Minimize the impact of climate change and disasters.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H6: Expand neighborhood drainage programs.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

12/17/2019

1.e.10

Authorization to Negotiate

03/24/2020

1.f.2

Contract Award for Professional Engineering Services

01/05/2021

1.g.3

Amendment #1 for Professional Engineering Services

05/24/2022

22-3247

Amendment #2 for Professional Engineering Services

08/23/2022

22-5023

Amendment #3 for Professional Engineering Services

08/27/2024

24-5078

Amendment #4 for Professional Engineering Services

 

Location: Cedar Bayou Subdivision

Address (if applicable): N/A

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Construction Phase Services

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund

$

$249,573.00

$249,573.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$249,573.00

$249,573.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$249,573.00

$249,573.00

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 2/6/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Harris County Engineering Department.

 

Attachments (if applicable): Contract Agreement