Legislation Details

File #: 24-0573    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 1/22/2024 In control: Commissioners Court
On agenda: 1/30/2024 Final action: 1/30/2024
Title: Request for approval of a change in contract with D & W Contractors, Inc in connection with Fountainview Sec 1 & 2 Subdivision Drainage Improvements - 2018, with an addition in the amount of $246,078.00, Job No. 22/0415-1, UPIN 19101MF12F01, Precinct 1, MWDBE Contracted Goal: 28%, MWDBE Current Participation: 54.6%.

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, County Engineer

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): UPIN 19101MF12F01

Vendor/Entity Legal Name (if applicable): D & W Contractors, Inc.

 

 

MWDBE Contracted Goal (if applicable): 28%

MWDBE Current Participation (if applicable): 54.6%

Justification for 0% MWDBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with D & W Contractors, Inc in connection with Fountainview Sec 1 & 2 Subdivision Drainage Improvements - 2018, with an addition in the amount of $246,078.00, Job No. 22/0415-1, UPIN 19101MF12F01, Precinct 1, MWDBE Contracted Goal: 28%, MWDBE Current Participation: 54.6%.

end

 

Background and Discussion:

The Fountain view Subdivision is in the Aldine area of northern Harris County, Precinct 1 and includes the following streets:  Farley Drive, Picton Drive, McCracken Rd, Indianola Drive, Mendota Lane, Surles Drive and Vickita Drive.  The subdivision is about a half mile northwest of the intersection of US 59 Eastex Freeway and Aldine-Bender Road.  The subdivision is surrounded by tributaries of Greens Bayou, including P133-0000 to the north, P133-04-00 to the west, and P133-03-00 to the east. The proposed drainage improvements include upsizing 1,730 feet of storm sewer system with diameters ranging from 24” to 48”, capacity improvements to 3,660 feet of the P133-03-00 and P133-04-00 grass lined ditches, the addition of a 12 acre-feet detention pond to the north of the subdivision, the installation of 1,400 feet of buried storm sewer system in P133-03-00 with sizes ranging from 36” RCP to 7’x4’ RCB, and in-kind replacement of roadway, curb, and gutter sections that are disturbed.

 

The Change in contract request includes new items for the following:

•                     PCO - 3 - Additional line item needed for the Headwalls (2) over 42" RCP along west channel from 5'2" to 6'5" height headwalls - Added new line item “Headwall along west Channel Over 42-in pipes to height of 6'5"” with an additional cost of $69,000.00 and 0 days for two headwalls walls.

•                     PCO - 4 - Additional quantities needed for line Item# 50 for 136 LF of 7X4 RCB's along East Channel to complete as per the design plans - Added quantities to existing line Item #50 with an additional cost of $125,120.00 and 0 days.

•                     PCO - 5 - Additional Line items needed for relocation of waterline in the detention pond area to complete as per the design plans - Added new line items “Miscellaneous items like cut & plug 6” waterline (1 Each), control ground water(lumpsum), 6” gate value and box (1 each), 6” tapping sleeve and value, 6” wet connect, trench waterline construction” with additional cost of $15,708.00 and 0 days. There will be a deduction of $11,250.00 from Line item#80- Relocate 6” water line in conflict with detention pond.

•                     PCO - 6 - Additional quantities needed for line Item# 64 for 3,000 SY of Sodding for Erosion Control (various width) and for line Item# 65 for 9 acres of Hydro mulching to complete as per the design plans - Added quantities to existing line Item #64 with an additional cost of $21,000.00 and 0 days and to existing line Item #65 with an additional cost of $18,000.00 and 0 days respectively.

•                     PCO - 7 - Additional quantity needed for line Item# 39 for 1-unit of Precast Junction Box (6’X6’) (5 FT ≤ DEPTH ≤ 10 FT) to complete as per the design plans - Added quantities to existing line Item #39 with an additional cost of $8,500.00 and 0 days.

 

Expected Impact:

This project seeks to reduce flood risk and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the community. This change in contract is a step in the process to reduce the financial, physical, and emotional burden flood damage places on homeowners and will reduce the financial impact of recovery costs to the Subdivision homeowners, Harris County, and FEMA. The fiscal impact for this project will come from the 1080 Funding for the Recovery and Resiliency Division subdivision projects with the long-term goal of reducing drainage costs in the future. No impact to project schedule or staffing anticipated.

 

Alternative Options:

If no action is taken, the engineer of record will not be accessible for support through the construction of the project.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

X Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

02/21/2023

309

Contract Award

 

 

 

 

Location: Fountainview Sec 1 & 2 Subdivision

Address (if applicable):

Precinct(s): Precinct 1

 

 

Fiscal and Personnel Summary

Service Name

 

 

FY 24

FY 25

Next 3 FYs

Incremental Expenditures (do NOT write values in thousands or millions)

Labor Expenditures

$

$

$

Non-Labor Expenditures

$246,078.00

$

$

Total Incremental Expenditures

$246,078.00

$

$

Funding Sources (do NOT write values in thousands or millions)

Existing Budget

1080 - Infrastructure Fund

$246,078.00

$

$

Choose an item.

$

$

$

Choose an item.

$

$

$

Total Current Budget

$246,078.00

$

$

Additional Budget Requested

Choose an item.

$

$

$

Choose an item.

$

$

$

Choose an item.

$

$

$

Total Additional Budget Requested

$

$

$

Total Funding Sources

$246,078.00

$

$

Personnel (Fill out section only if requesting new PCNs)

Current Position Count for Service

-

-

-

Additional Positions Requested

-

-

-

Total Personnel

-

-

-

 

Anticipated Court Date:  January 30, 2024.

Anticipated Implementation Date (if different from Court date):

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Director of Disaster & Recovery and Resiliency Division, Harris County Engineering Department

Attachments (if applicable): Change in Contract (CIC)