Legislation Details

File #: 25-1129    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 2/3/2025 In control: Commissioners Court
On agenda: 2/13/2025 Final action: 2/13/2025
Title: Request for approval of an encroachment agreement with Chevron Phillips Chemical Company LP, for the construction of the stormwater detention basin, maintenance berm with swale, all-weather access path and backslope interceptors within an existing easement near HCFCD Unit B112-00-00 and B112-02-00, Brookglen Stormwater Detention Basin (Armand Bayou Watershed, Bond ID C-06, Project ID B512-02-00-E002, Precinct 2).
Attachments: 1. 022725 AGMT CHEVRON 2024-80 PCT 2 backup

Primary Department: Flood Control District

Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): B512-02-00-E002

Vendor/Entity Legal Name (if applicable): Chevron Phillips Chemical Company LP

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of an encroachment agreement with Chevron Phillips Chemical Company LP, for the construction of the stormwater detention basin, maintenance berm with swale, all-weather access path and backslope interceptors within an existing easement near HCFCD Unit B112-00-00 and B112-02-00, Brookglen Stormwater Detention Basin (Armand Bayou Watershed, Bond ID C-06, Project ID B512-02-00-E002, Precinct 2).

end

 

Background and Discussion:

The goal of the Brookglen Stormwater Detention Basin is to maximize the storage capacity created by the detention basin to reduce flood damages in and around the Brookglen Subdivision in the vicinity of Willow Springs Creek (Unit B112-00-00) and B112-02-00 confluence. The project consists of constructing of South Detention Basin in the Brookglen Subdivision. Over 100 structures were inundated during Tropical Storm Allison (June 2001) and Hurricane Harvey (August 2017).

 

Expected Impact:

Approval of this encroachment agreement will allow this CDBG project to move forward. 

 

Alternative Options:

The alternative would be to not take any actions, where the project will not be constructed at this location, and flood risks in this area will remain.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/AN/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any): N/A

Date

Agenda Item #

Action Taken

 

 

 

 

Location: N/A

Address (if applicable):

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

N/A

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 2/13/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District

 

Attachments (if applicable): Agreement and Map