Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Regular or Supplemental RCA: Regular RCA
Type of Request: Donation
Project ID (if applicable): 19103MF15V01
Vendor/Entity Legal Name (if applicable): Weiser BP Phase II, LLC, a Delaware limited liability company
MWDBE Contracted Goal (if applicable): Not Applicable
MWDBE Current Participation (if applicable): Not Applicable
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request
Request Summary (Agenda Caption):
title
Request for approval for Harris County to accept a real estate donation of a 1.051-acre Storm Sewer Easement and the County Judge to execute a proposed gift form, tract number 3, for the public project known as Kolbe Road & Related Infrastructure Drainage Improvements - 2018, from Weiser BP Phase II, LLC, a Delaware limited liability company, with the HCAD value of $114,445.00, UPIN 19103MF15V01, Precinct 3.
end
Background and Discussion:
The project is in northwest Harris County, south of Cypress North Houston Road and east of Telge Road. The existing drainage system consists of roadside ditches which outfall to the east of the Cypress Chase subdivision to HCFCD Channel E133-01-00. The scope and proposed improvements include bringing South Kolbe Circle, South Kolbe Drive, Village Circle, Scott Circle, and Laura Circle into compliance with Harris County Standards. Additionally, the proposed drainage design will consist of grate inlets located in the existing roadside ditches draining via circular pipes under a proposed swale.
Expected Impact:
This project seeks to reduce flood risk and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the community. This modification is a step in the process to reduce the financial, physical, and emotional burden flood damage places on homeowners and will reduce the financial impact of recovery costs to the homeowners surrounding the Kolbe Road and Related Infrastructure improvements project, Harris County, and FEMA. No staffing impacts expected with the fiscal impact for this project coming from the 1080 Fund, Special Mobility Funding for the Recovery and Resiliency Division subdivision projects with the long-term goal of reducing drainage costs in the future.
Alternative Options:
No Alternative options available.
Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
X Transportation
X Flooding
_ Environment
_ Governance and Customer Service
Prior Court Action (if any): None
|
Date |
Agenda Item # |
Action Taken |
|
|
|
|
Location:
Address (if applicable): 0 Fallbrook Drive, Cypress, TX 77429
Precinct(s): Precinct 3
|
Fiscal and Personnel Summary |
|
Service Name |
|
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Current Budget |
$ |
$ |
$ |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Request |
$ |
$ |
$ |
$ |
|
Personnel (Fill out section only if requesting new PCNs) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
Anticipated Court Date: August 6, 2024
Anticipated Implementation Date (if different from Court date):
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Trevor Smith, Interim Assistant Director, Real Property Division
Attachments (if applicable): Storm Sewer Easement with Metes and Bounds; Form 770