Department: County Engineer
Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Regular or Supplemental RCA: Regular RCA
Type of Request: Public Necessity
Project ID (if applicable): 20104MF1BX01
Vendor/Entity Legal Name (if applicable): Not applicable
MWDBE Contracted Goal (if applicable): Not applicable
MWDBE Current Participation (if applicable): Not applicable
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request
Request Summary (Agenda Caption):
title
Request for approval of a certain project, decreeing the project to be a public necessity and convenience, and directing the Harris County Real Property Division to acquire, one (1) road easement and one (1) fee simple tracts for the public project known as Spring Stuebner Rd Segment E from 500-ft West of Leitner Way Dr to West of SH99 - 2019, for the purpose of roadway construction, UPIN 20104MF1BX01, Precinct 3.
end
Background and Discussion:
The project involves the upgrade Spring Stuebner Road, from west of Leitner Way to State Highway 99, as a 4-lane concrete pavement section with improved drainage accommodations in a 100-foot right-of-way. A detention basin is required for mitigation. The geometry of a basin will follow HCFCD design criteria and have 4:1 or flatter side slopes. Property acquisition is required to construction detention basin.
Expected Impact:
The expected impact of the project includes improved traffic flow and reduced congestion, enhanced safety for drivers and pedestrians, and better stormwater management, which will mitigate flooding issues. Additionally, the upgrade will support regional development by providing a more reliable and efficient transportation corridor, ultimately enhancing connectivity, and boosting local economic growth.
Alternative Options:
If not approved, the road and drainage systems will remain unchanged.
Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
X Transportation
X Flooding
_ Environment
_ Governance and Customer Service
Prior Court Action (if any): None
Date |
Agenda Item # |
Action Taken |
|
|
|
Location:
Address (if applicable): 22333 Kuykendahl Road, Spring, TX 77379
Precinct(s): Precinct 3
Fiscal and Personnel Summary |
Service Name |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
Funding Sources |
|
Existing Budget |
|
|
|
|
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Current Budget |
$ |
$ |
$ |
$ |
Additional Budget Request (Requires Fiscal Review Request Form) |
|
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Choose an item. |
$ |
$ |
$ |
$ |
Total Additional Budget Request |
$ |
$ |
$ |
$ |
Total Funding Request |
$ |
$ |
$ |
$ |
Personnel (Fill out section only if requesting new PCNs) |
|
Current Position Count for Service |
- |
- |
- |
- |
Additional Positions Request |
- |
- |
- |
- |
Total Personnel |
- |
- |
- |
- |
Anticipated Court Date: September 19, 2024
Anticipated Implementation Date (if different from Court date):
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Trevor Smith, Assistant Interim Director, Real Property Division
Attachments (if applicable): Findings and Declarations; Survey Descriptions and Maps