Title: Request for approval of change in contract No. 5 with Environmental Allies Inc., for the rehabilitation of channels within Addicks Reservoir, adding 16 calendar days (Addicks Reservoir Watershed, Project ID U100-00-00-X076, Job No. 25/0303, Precinct 4, MWBE Contracted Goal: 24.88%, MWBE Current Participation 10.37%).
Attachments: 1. 091726 CIC NO. 5 ENVIRON ALLIES U100-X076 PCT 4 backup.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Primary Department: Flood Control District

Primary Department Head/Elected Official: Marcus Y. Stuckett, P.E., CFM

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): U100-00-00-X076

Vendor/Entity Legal Name (if applicable): Environmental Allies Inc.

 

MWBE Contracted Goal (if applicable): 24.88%

MWBE Current Participation (if applicable): 10.37%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of change in contract No. 5 with Environmental Allies Inc., for the rehabilitation of channels within Addicks Reservoir, adding 16 calendar days (Addicks Reservoir Watershed, Project ID U100-00-00-X076, Job No. 25/0303, Precinct 4, MWBE Contracted Goal: 24.88%, MWBE Current Participation 10.37%).

end

 

Background and Discussion:

This change order adds 16 calendar days to the contract due to inclement weather experienced from February through June 2026. The contract includes 17 days to accommodate inclement weather. During the period from February 2026 through June 2026, a total of 33 qualifying inclement weather days were recorded: February (3), March (3), April (10), May (10), and June (7). The 33 inclement weather days exceed 110% of the 17 contract allowable days, entitling the Contractor to a time extension per the General Conditions. Per the contract, the extension is calculated as the number of inclement weather days exceeding 100% of the allowable days: 33-17 = 16 additional calendar days.

 

Expected Impact:

This change will allow the contractor to construct the project so that Harris County can realize intended flood risk reduction benefits. 

 

Alternative Options:

This is an active construction contract, so there are not many alternatives to approving a change order other than cancelling the contract, which is not recommended as doing so would substantially delay the remaining work in the construction contract.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

06/25/2026

39.

Change in Contract No. 1

12/11/2025

347.

Award

10/16/2025

492.

Advertisement

 

Location: N/A

Address (if applicable):

Precinct(s): Precinct 4

 

Fiscal and Personnel Summary

Service Name

N/A

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 9/17/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District

 

Attachments (if applicable): Change in Contract and Map