File #: 23-6822    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 11/6/2023 In control: Commissioners Court
On agenda: 11/14/2023 Final action: 11/14/2023
Title: Request for approval of a Professional Services agreement with Lockwood, Andrews and Newnam, Inc. for Construction Phase Services in the amount of $73,124.59 for the Recovery and Resiliency Division (RRD) Aldine Village East Subdivision Drainage Improvements - 2018, UPIN 24208MF33K01, Precinct 2, MWDBE Contracted Goal: 25%.
Sponsors: Mony Hossain
Attachments: 1. 23-6822-Consultant- Aldine Village CPS-Lockwood, Andrews and Newman (LAN), Inc.23GEN3143 Updated

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E, PMP, CFM, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): UPIN 24208MF33K01 - Job No.: 23/0360

Vendor/Entity Legal Name (if applicable): Lockwood, Andrews and Newnam, Inc.

 

MWDBE Contracted Goal (if applicable): 25%

MWDBE Current Participation (if applicable):

Justification for 0% MWDBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Request Summary (Agenda Caption):

title

Request for approval of a Professional Services agreement with Lockwood, Andrews and Newnam, Inc. for Construction Phase Services in the amount of $73,124.59 for the Recovery and Resiliency Division (RRD) Aldine Village East Subdivision Drainage Improvements - 2018, UPIN 24208MF33K01, Precinct 2, MWDBE Contracted Goal: 25%.

end

 

Background and Discussion:

The Aldine Village Subdivision Drainage Improvements - 2018 (East Package) project consists of subdivision drainage improvements. Major work activities include replacing and upsizing storm sewer systems and reconstructing roadside ditches along Sellers Road between Ridgeland Court and Corvette Court, including culvert and driveway replacements, constructing a new storm sewer along Corvette Court, and constructing an extension of HCFCD channel Unit No. P118-25-01

 

The additional funds will cover the construction phase services agreement to allow for construction oversight of the project.

 

Expected Impact:

This project seeks to reduce flood risk and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the community. Engineering support during the construction of the improvements is a step in the process to reduce the financial, physical, and emotional burden flood damage places on homeowners and will reduce the financial impact of recovery costs to the Aldine Village Subdivision Project area, Harris County, and FEMA. The fiscal impact for this project will come from the 1080 Fund for the Recovery and Resiliency Division subdivision projects with the long-term goal of reducing drainage costs in the future. No impact to project schedule or staffing anticipated.

 

 

 

Alternative Options:

If no action is taken, the engineer of record will not be accessible for support through the
construction of the project.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

X Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

 

 

 

 

Location: Aldine Village East Subdivision

Address (if applicable): Precinct 2

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

 

 

FY 24

FY 25

Next 3 FYs

Incremental Expenditures (do NOT write values in thousands or millions)

Labor Expenditures

$

$

$

Non-Labor Expenditures

$73,124.59

$

$

Total Incremental Expenditures

$73,124.59

$

$

Funding Sources (do NOT write values in thousands or millions)

Existing Budget

1080 - Infrastructure Fund

$73,124.59

$

$

Choose an item.

$

$

$

Choose an item.

$

$

$

Total Current Budget

$73,124.59

$

$

Additional Budget Requested

Choose an item.

$

$

$

Choose an item.

$

$

$

Choose an item.

$

$

$

Total Additional Budget Requested

$

$

$

Total Funding Sources

$73,124.59

$

$

Personnel (Fill out section only if requesting new PCNs)

Current Position Count for Service

-

-

-

Additional Positions Requested

-

-

-

Total Personnel

-

-

-

 

Anticipated Court Date: November 14, 2023

Anticipated Implementation Date (if different from Court date):

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Director, Recovery and Resiliency Division

Attachments (if applicable): Construction Phase Services Agreement