Primary Department: Purchasing
Primary Department Head/Elected Official: Kimberly J. Williams, JD
Secondary Department: Flood Control District
Secondary Department Head/Elected Official: Marcus Stuckett
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Award
Project ID (if applicable): 260332
Vendor/Entity Legal Name (if applicable): Northtex Construction, LLC
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of an award on the basis of low bid to Northtex Construction, LLC in the amount of $16,259,518 for Friendswood Regional Stormwater Detention Basin for the Flood Control District, and for the County Clerk to execute any applicable bonds to be received (260332).
end
Background and Discussion:
The Friendswood Regional Stormwater Detention Basin (FWRSDB) is located on an approximately 105-acre tract in Precinct 2 in southeastern Harris County within the 197 square mile Clear Creek Watershed. HCFCD and Harris County have free ownership or easement of all 105 acres of the project site area. This project is the partnership project between the City of Friendswood, Galveston County, Galveston Consolidated Drainage District and Harris County Flood Control District. The objective of this project is to reduce overall peak flows, decrease the water surface elevation in Clear Creek (A100-00-00), and provide detention mitigation capacity for future projects, while maintaining environmental quality in the surrounding area. Alternative 1, recommended alternative is a dry-bottom stormwater detention basin with a total area of 70 acres that avoids jurisdictional wetlands and eligible National Register of Historic Places (NRHP) site.
Expected Impact:
Benefits for alternative 1 include removing 77 structures from the floodplain, 86.3 acres from the inundation area and 2.1 miles of inundated roadway for the 100-year storm event.
Alternative Options: There is no alternative option for this project.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): H2: Evaluate the feasibility and potential impacts of substantial, large-scale flood mitigation measures to provide equitable and transformational regional benefits.
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan:
Prior Court Action (if any): N/A
|
Date |
Agenda Item # |
Action Taken |
|
|
|
|
Location:
Address (if applicable): The project is bounded by A100-00-00 on the south and west sides, FM 1959 on the north and by the Gulf Freeway on the east side
Precinct(s): Precinct 2
|
Fiscal and Personnel Summary |
|
Service Name |
|
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Bonds |
$ |
$16,259,518.44 |
$16,259,518.44 |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
$16,259,518.44 |
$16,259,518.44 |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
$16,259,518.44 |
$16,259,518.44 |
$ |
|
Grants - Proposed Budget (For Grants Items only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
|
Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
|
County Attorney’s Office Legal Review (for Harris County Code Items only) |
|
CAO Reviewer Name and Title |
|
CAO Review Completion Date |
Click or tap to enter a date. |
Anticipated Court Date: 11/19/2026
Anticipated Implementation Date (if different from Court date): 11/19/2026
Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item
Contact(s) name, title, department: Pooja Bhatta, P.E., PMP, CFM, Engineering Project Manager, Capital Projects South; Luke Herdrich, Senior Buyer, Harris County Purchasing
Attachments (if applicable): Letter