File #: 25-2644    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 4/23/2025 In control: Commissioners Court
On agenda: 5/8/2025 Final action: 5/8/2025
Title: Request for approval of a change in contract with Bear Services, LP, in connection with Sidewalk - Holland Avenue - 2021, adding 128 days, with no change in the amount, Job No. 21/0365-1, UPIN 22102MF2DC01, Precinct 2, MWBE Contracted Goal: 16%, MWBE Current Participation: 23.35%.

Primary Department: County Engineer

Primary Department Head/Elected Official:  Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 21/0365, UPIN 22102MF2DC01 

Vendor/Entity Legal Name (if applicable): Bear Services, LP

 

MWBE Contracted Goal (if applicable): 16%

MWBE Current Participation (if applicable): 23.35%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Bear Services, LP, in connection with Sidewalk - Holland Avenue - 2021, adding 128 days, with no change in the amount, Job No. 21/0365-1, UPIN 22102MF2DC01, Precinct 2, MWBE Contracted Goal: 16%, MWBE Current Participation: 23.35%.

end

 

Background and Discussion:

The construction project along Holland Avenue, extending from Clint Drive to 18th Street, involves the installation of sidewalks and driveways to enhance pedestrian accessibility and safety.  This initiative aims to provide a continuous and ADA-compliant pedestrian pathway, improving connectivity for residents and facilitating safer routes for pedestrians.

The project faced several challenges that required design modifications and adjustments, resulting in a cumulative delay of 128 days without additional costs.

1.                     Field Condition Adjustments (PCOs 1, 3, 4, 6, 7)

Adjustments were required due to unexpected field conditions, such as driveway slope corrections, drainage improvements, retaining wall installations, and trench drains to maintain compliance and stability.

Total Schedule Impact: 47 days.

2.                     Design Plan Revisions (PCOs 2, 5, 8, 10, 12)

Modifications to the original design included replacing deteriorated sidewalks, revising driveways, redesigning parking layouts, and installing concrete walls to enhance access and safety. Total Schedule Impact: 61 days

3.                     Utility Conflicts and Structural Adjustments (PCOs 9, 11)

Addressing utility conflicts and structural integrity issues required design adjustments, coordination with utility providers, and installation changes, including bridge rails and utility clearances.  Total Schedule Impact: 20 days

 

Expected Impact:

These changes will enhance compliance with safety and ADA standards, improve drainage, and address potential rework, ultimately increasing the durability and functionality of the project.

 

Alternative Options:

Proceeding with the Original Design Plans Without Adjustments

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F1: Strengthen the County’s commitment to Vision Zero principles and goals.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

04/23/2024

308 (24-2535)

Contract Renewal

04/10/2025

178 (25-2260)

Extend Contract Renewal

 

Location:

Address (if applicable):

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund 3109, 3021

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 5/8/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B