Legislation Details

File #: 26-3625    Version: 1 Name:
Type: Report Status: Passed
File created: 5/28/2026 In control: Commissioners Court
On agenda: 6/11/2026 Final action: 6/11/2026
Title: Request for approval of a Study Report prepared by Entech Civil Engineers, Inc. for roadway widening, bridge replacements, sidewalk installations and street lighting along Fairmont Parkway (Segment 1 - Red Bluff Rd to 700' west of Canada Drive), UPIN 24102MF3KM01, Precinct 2.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Report

 

Project ID (if applicable): UPIN: 24102MF3KM01

Vendor/Entity Legal Name (if applicable): Entech Civil Engineers, Inc.

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

...title

Request for approval of a Study Report prepared by Entech Civil Engineers, Inc. for roadway widening, bridge replacements, sidewalk installations and street lighting along Fairmont Parkway (Segment 1 - Red Bluff Rd to 700’ west of Canada Drive), UPIN 24102MF3KM01, Precinct 2.

...end

 

Background and Discussion:

Fairmont Parkway Segment 1 is part of a five-segment project that includes constructing an additional outside lane in each direction, repairing and/or overlaying of existing pavement, adding new sidewalks and improving drainage. The project also includes replacement of the bridges at Willow Springs Bayou to accommodate the additional lanes and pedestrian traffic. A portion of the project is in the City of Pasadena and City of La Porte.

 

Expected Impact:

This project seeks to improve transportation and pedestrian mobility by improving road conditions to enhance traffic flow and provide smoother and safer travel for motorists, while also creating a pedestrian-friendly environment by constructing sidewalks, promoting active transportation, and improving overall pedestrian access.

 

 

 

 

Alternative Options:

If no action is taken, the area will continue to realize traffic delays and impacts on mobility.

 

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F1: Strengthen the County’s commitment to Vision Zero principles and goals.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

3/27/2025

25-1606

Approval of an agreement with Entech Civil Engineers, Inc. in the amount of $2,683,000.00 for Professional Engineering Services in connection with the Fairmont Parkway - 1 - From Red Bluff to 700' West of Canada Drive - 2024 project and design coordination for Segments 2, 3 & 4 for Fairmont Parkway Improvements, UPIN 24102MF3KM01, Precinct 2, MWBE Contracted Goal: 19.835%.

 

Location:

Address (if applicable):

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 6/11/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer

 

Attachments (if applicable): Preliminary Engineering Report