Title: Transmittal by the Flood Control District of a preliminary engineering report by 5Engineering, dated November 1, 2024, and titled Vince Bayou Channel Conveyance Improvements Preliminary Engineering Report (Vince Bayou Watershed, Bond ID F-104, Project ID I100-00-00-E001, Precinct 2).
Attachments: 1. I100-00-00-E001 PBM.pdf

Primary Department: Flood Control District

Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Transmittal

 

Project ID (if applicable): I100-00-00-E001

Vendor/Entity Legal Name (if applicable): 5Engineering

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Transmittal by the Flood Control District of a preliminary engineering report by 5Engineering, dated November 1, 2024, and titled Vince Bayou Channel Conveyance Improvements Preliminary Engineering Report (Vince Bayou Watershed, Bond ID F-104, Project ID I100-00-00-E001, Precinct 2).

end

 

Background and Discussion:

The purpose of the Preliminary Engineering Report (PER) was to evaluate recommended flood risk reduction projects from the Vince Bayou Watershed Planning Study and develop a recommended combination of projects that can be constructed within the available budget.  A community engagement meeting was held September 10, 2024. The Flood Control District plans to utilize the remaining funds in Bond ID F-99 to design and construct the recommended basins and channel improvements.

 

Expected Impact:

The acceptance of this PER will allow the Flood Control District to seek to reduce flood risks and strengthen resiliency in the Vince Bayou watershed. As the first phase of the ultimate project recommendation made in the watershed planning study this project will provide additional stormwater detention in the area.

 

Alternative Options:

The alternative to approving this item would be not approving this Preliminary Engineering Report, which would result in the Flood Control District not proceeding with the final design of this project.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any): N/A

Date

Agenda Item #

Action Taken

 

 

 

 

Location: N/A

Address (if applicable):

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

N/A

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 1/9/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District

 

Attachments (if applicable): Map