Title: Transmittal by the Flood Control District of a preliminary engineering report by AECOM Technical Services, Inc., dated June 12, 2025, and titled Halls Bayou P118-00-00 Mainstream Improvements Downstream of Hopper (Halls Bayou Watershed, Bond ID C-41, Project ID P118-00-00-E007, Precinct 2).

Primary Department: Flood Control District

Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Transmittal

 

Project ID (if applicable): P118-00-00-E007

Vendor/Entity Legal Name (if applicable): AECOM Technical Services Inc.

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Transmittal by the Flood Control District of a preliminary engineering report by AECOM Technical Services, Inc., dated June 12, 2025, and titled Halls Bayou P118-00-00 Mainstream Improvements Downstream of Hopper (Halls Bayou Watershed, Bond ID C-41, Project ID P118-00-00-E007, Precinct 2).

end

 

Background and Discussion:

The Halls Bayou P118-00-00 Mainstream Improvements project was initiated by the Harris County Flood Control District (HCFCD) to address long-standing flooding issues in the Halls Bayou watershed, where thousands of homes have repeatedly flooded during major storms such as Tropical Storm Allison in 2001 and Hurricane Harvey in 2017. As part of the Halls Bayou Bond Implementation Program and building upon the 2013 “Halls Ahead” Vision Plan and the 2019 Phasing Study, this project focuses on channel conveyance improvements to reduce flood risk. The current analysis refines the 2021 Alternative Analysis by Lockwood, Andrews & Newnam, Inc., which identified the preferred design alternative, and incorporates necessary design modifications while minimizing right-of-way, environmental, and utility conflicts. In total, the project extends 1.3 miles along Halls Bayou, downstream of Hopper Road, and is supported by previously constructed detention basins that provide mitigation for the planned improvements.

 

Expected Impact:

The acceptance of this PER will allow the Flood Control District to move into the design stage of the recommended project, once the necessary funding is in place, and to finalize the design so that the project can be bid and constructed. 

 

 

Alternative Options:

The alternative should this PER not be approved is that the Flood Control District will not proceed to the design phase of our project lifecycle.

 

County Strategic Plan Goal:  5. Minimize the impact of climate change and disasters.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

 

 

 

 

 

 

 

Location: N/A

Address (if applicable):

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

N/A

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 10/16/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District

 

Attachments (if applicable): Map