Title: Request for approval of a change in contract with GLM Contracting, Inc., in connection with On-Call - Construction of Sidewalks and Related Items for Harris County Precinct 3 - 2023, with no change in the amount, Job No. 23/0121-1, UPIN 23103MF2YA01, Precinct 3, MWBE Contracted Goal: 29%, MWBE Current Participation: 56.58%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 23/0121, UPIN 23103MF2YA01

Vendor/Entity Legal Name (if applicable): GLM Contracting, Inc.

 

MWBE Contracted Goal (if applicable): 29%

MWBE Current Participation (if applicable): 56.58%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with GLM Contracting, Inc., in connection with On-Call - Construction of Sidewalks and Related Items for Harris County Precinct 3 - 2023, with no change in the amount, Job No. 23/0121-1, UPIN 23103MF2YA01, Precinct 3, MWBE Contracted Goal: 29%, MWBE Current Participation: 56.58%.

end

 

Background and Discussion:

Project includes construction services of sidewalks for a variety of locations throughout Precinct 3.  The Precinct has requested for the new bid item to be added for the Contractor to be compensated for work already completed.

 

Change includes adding bid Item #110 (PCO # 32) for furnishing and installing oversized electrical boxes within Precinct 3.

•                     Item 110 - Furnish & Install Oversized Electrical Boxes ($800/EA) - All missing in the current bid. 

 

The new bid item is only to establish the unit price and there is no change to the contract amount.

 

Expected Impact:

Change allows Contractor to remove and replace brick fence within the Precinct 3 limit.

 

Alternative Options:

Maintain the original scope of the project.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F2: Improve data collection, utilization, and availability to drive better transportation safety decision-making.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

06/25/2024

239 (24-3866)

Contract Renewal

06/26/2025

189 (25-3952)

Contract Renewal

 

Location:

Address (if applicable):

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 10/16/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 