Legislation Details

File #: 26-7006    Version: 1 Name:
Type: Investment Memo Status: Agenda Ready
File created: 10/7/2026 In control: Commissioners Court
On agenda: 10/15/2026 Final action:
Title: Request by Universal Services for approval of the Final Investment Memo for the Fleet Services and Equipment project for a total authorization of $1,160,000 for FY 2027 and request for commercial paper funding in the amount of $700,000.
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Primary Department: Universal Services

Primary Department Head/Elected Official: Sindhu Menon, Executive Director and CIO

Managing Department: Universal Services

Managing Department Head/Elected Official: Sindhu Menon, Executive Director and CIO

Regular or Supplemental RCA: Supplemental RCA

Type of Request: Investment Memo

Investment Memo Type: Final Investment Memo

 

Project Name: Fleet Vehicles

Project ID (if applicable): NI034

Vendor Legal Name (if applicable): N/A

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Achievement (if applicable): N/A

Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Incremental Authorization Requested: $1,160,000

Total Estimated Project Cost: $1,160,000 (FY27)

 

Request Summary:

title

Request by Universal Services for approval of the Final Investment Memo for the Fleet Services and Equipment project for a total authorization of $1,160,000 for FY 2027 and request for commercial paper funding in the amount of $700,000.

end

 

Project Description:

This is a multi-year project to ensure Fleet Services has the capital equipment it needs to fuel and service the County’s fleet. This includes 19 fuel stations and over 4,600 vehicles being serviced at 7 vehicle maintenance centers. FY27 contemplates $1,159,200.000 for replacement and updates to equipment for the vehicle maintenance centers as well as renovations to 2505 Texas location.

There might be changes in the County’s needs that result in operational changes for the project throughout the Fiscal Year, but the overall scope will remain the same

 

Anticipated Project Expenditures and Timeline:

Description

Quantity

Cost

Total

Install automated bulk fluid management systems at Downtown (2), Katy (1), and Tomball (1) to improve technician productivity, reduce PM cycle times, improve vehicle downtime and improve operation readiness, improve inventory accountability, minimize fluid waste and shrinkage, enhance workplace safety, and standardize fluid dispensing operations at Harris County Fleet's highest-volume facilities.

4

$75,000

$300,000

Install a drive-over vehicle inspection system at Downtown VMC to automate tire tread, alignment, and undercarriage condition assessments. Improves early defect detection, increases inspection consistency, reduces technician inspection time, and supports proactive maintenance and fleet readiness.

1

$100,000

$100,000

Replace aging compressed air infrastructure to ensure reliable operation of lifts, tire equipment, pneumatic tools, and shop equipment. Improves operational reliability, reduces downtime caused by equipment failures, and supports increased shop throughput.

1

$30,000

$30,000

Replace aging vehicle lifts to improve shop safety, increase service capacity, reduce equipment downtime, and support maintenance of larger and specialized fleet assets. Replacement supports continued fleet growth and operational readiness.

4

$15,000

$60,000

Install or upgrade Automatic Tank Gauge systems at fleet fueling locations to improve fuel inventory monitoring, leak detection, environmental compliance, fuel accountability, and operational reliability. Supports fuel management modernization and reduces manual monitoring requirements.

5

$32,200

$161,000

Install high-speed insulated roll-up doors at VPC (1) and Downtown VMC (2) to improve vehicle throughput, reduce climate loss, improve facility security, and enhance technician productivity by reducing wait times associated with conventional bay doors.

3

$40,000

$120,000

Implement a Traka or Key Watcher electronic key management system to improve vehicle key accountability, enhance security, support after-hours operations, reduce lost key incidents, and provide an auditable chain of custody for fleet assets.

1

$25,000

$25,000

Install a backup generator at the 66th Street facility to ensure continuity of fleet maintenance, fueling, communications, and emergency response operations during power outages, hurricanes, and other disasters.

1

$135,000

$135,000

Install High Volume Low Speed (HVLS) fans at the Tomball VMC to improve air circulation, reduce heat stress, improve technician comfort and productivity, and support employee retention and workplace safety.

1

$35,000

$35,000

Subtotal

 

 

$966,000

Contingency

20%

 

$194,000

Total

 

 

$1,160,000

 

 

Justification & Alternatives:

These funds will support the planned growth in law enforcement operations.

No Alternatives

Anticipated Impact on Other Funds (If Applicable):

Fund Code

Description

Estimated Cost

Funding Method  (Existing or Future Budget Request Required)

Estimated Date of Needs

 

 

$-

 

-

 

 

$-

 

-

Total

 

$-

 

-

 

County Strategic Plan Goal:  5. Minimize the impact of climate change and disasters.

County Strategic Plan Objective: R: Enhance disaster preparedness, response, recovery, and resiliency.

Justice/Safety Initiative (Goal 1):   Choose an item.

Infrastructure Initiative (Goal 2):  Choose an item.

Economy Initiative (Goal 3): Choose an item.

Health Initiative (Goal 4): Choose an item.

Climate/Resilience Initiative (Goal 5): R3: Strengthen the County’s emergency response function.

Housing Initiative (Goal 6): Choose an item.

 

 

 

 

 

Previous Court Action:

 

Agenda <javascript:__doPostBack('ctl00$ContentPlaceHolder1$gridMain$ctl00$ctl02$ctl01$ctl00','')> itemDate <javascript:__doPostBack('ctl00$ContentPlaceHolder1$gridMain$ctl00$ctl02$ctl01$ctl11','')>Action Taken

 

 

22-0641 <https://harriscountytx.legistar.com/LegislationDetail.aspx?ID=5389611&GUID=D911DDBF-AE4F-46AB-A3E6-068B569B7B0B&Options=ID|Text|&Search=ni034>1/25/2022

Request for approval of commercial paper funding for Universal Services for the Fleet Services & Equipment project in the additional amount of $1,845,000 for a total CP funding of $2,490,000.

 

22-1703 <https://harriscountytx.legistar.com/LegislationDetail.aspx?ID=5477729&GUID=41F4A5CC-070A-4755-A527-0703F76BCE62&Options=ID|Text|&Search=ni034>3/8/2022

Request for approval of the Final Investment Memo for Fleet Services Equipment Repair/Replace project for no additional incremental authorization for a SFY 2022 authorization of $1,581,000.

 

22-4955 <https://harriscountytx.legistar.com/LegislationDetail.aspx?ID=5764223&GUID=136A6326-6460-451E-8C96-47B485473EC4&Options=ID|Text|&Search=ni034>8/23/2022

Request for approval of the Final Investment Memo for Fleet Services Equipment Repair/Replace project for no additional incremental authorization for an FY 2023 authorization of $2,004,000.

 

22-7253 <https://harriscountytx.legistar.com/LegislationDetail.aspx?ID=5936540&GUID=DD793F39-5594-4E0C-8691-8FB784C7ECF2&Options=ID|Text|&Search=ni034>11/15/2022

Request for approval to decrease commercial paper funding for Universal Services for the Fleet Services and Equipment project in the amount of $1,000,000 for a net CP funding of $1,490,000.

 

23-3560 <https://harriscountytx.legistar.com/LegislationDetail.aspx?ID=6271208&GUID=81F13BF8-A74E-4B62-B62E-BDDAF73F3D5F&Options=ID|Text|&Search=ni034>6/27/2023

Request for approval of the Final Investment Memo for Fleet Services Equipment Repair/Replace project for an additional incremental authorization of $720,000 for FY2024.

 

24-5061 <https://harriscountytx.legistar.com/LegislationDetail.aspx?ID=6838496&GUID=A5271701-38C7-4412-AC91-C8C4DDA4FE24&Options=ID|Text|&Search=ni034>8/27/2024

Request for approval of commercial paper funding for Universal Services for the Fleet Services and Equipment project in the additional amount of $500,000 for a total CP funding of $1,990,000.

 

24-6285 <https://harriscountytx.legistar.com/LegislationDetail.aspx?ID=6883604&GUID=17B321A7-C914-4DB9-BC7E-490DAB5320FC&Options=ID|Text|&Search=ni034>10/8/2024

Request for approval of the Final Investment Memo for Fleet Services Equipment Repair/Replace project for a total authorization of $800,000 for FY2025.

 

25-5189 <https://harriscountytx.legistar.com/LegislationDetail.aspx?ID=7522045&GUID=39A4CC5E-F8F9-4930-866E-36FBAB502880&Options=ID|Text|&Search=ni034>8/26/2025

Request for approval of the Final Investment Memo for Fleet Services and Equipment project for an incremental authorization of $550,000 for a total authorization of $800,000 for FY 2026 and commercial paper funding in the amount of $550,000.

 

 

 

                     

Address: N/A

Precinct(s): Countywide

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

 

 

 

 

 

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$

$

$

Additional Budget Request

 

Commercial Paper

$

$700,000

$700,000

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$700,000

$700,000

$

Total Funding Request

$

$700,000

$700,000

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 10/15/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

Legal funding compliance confirmed by: Paige Abernathy, First Assistant County Attorney-Legal Operations, 7/22/2025

Department Approval by: Heather Merkel, Director of Budget, Universal Services 7/31/2026

OMB CIP Team Approval by: William McGuinness, Director-Capital Projects & Infrastructure, 9/30/2026

Commercial Paper Request (For OMB use only):

Receiving Department: Universal Services

Project PeopleSoft ID: NI034

CP Series Description: Commercial Paper A-1 is used to (1) pay contractual obligations incurred or to be incurred for the construction of and the purchase of fixtures, equipment and machinery for or in connection with the County's criminal and civil justice centers, the County's firefighter training facility, (2) pay contractual obligations incurred or to be incurred for the purchase of automobiles and other vehicles, equipment and machinery, including computers, materials and supplies for the operations of the County precincts and departments and other authorized needs and purposes including services provided by engineers, architects, attorneys, auditors, financial advisors.

Commercial Paper is being requested for the Fleet Services and Equipment project and is expected to be repaid within the next three fiscal years either through bonds, budgetary means or pay-as-you-go sources.

 

OMB Financial Management contact: Fahad Gulzar, Deputy Executive Director, Office of Management and Budget