Legislation Details

File #: 25-5151    Version: 1 Name:
Type: Interlocal Agreement Status: Passed
File created: 8/13/2025 In control: Commissioners Court
On agenda: 8/26/2025 Final action: 8/26/2025
Title: Request for approval to execute an Interlocal Agreement with the City of La Porte for hike and bike trails which would connect 6 city parks along with a trail head located on Fairmont Parkway to allow access to a new trail system, UPIN 24102MF3HF01, Precinct 2.

 Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: Commissioner, Precinct 2

Secondary Department Head/Elected Official: Adrian Garcia

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Interlocal Agreement

 

Project ID (if applicable): 24102MF3HF01

Vendor/Entity Legal Name (if applicable): City of La Porte

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval to execute an Interlocal Agreement with the City of La Porte for hike and bike trails which would connect 6 city parks along with a trail head located on Fairmont Parkway to allow access to a new trail system, UPIN 24102MF3HF01, Precinct 2.

end

 

Background and Discussion:
The City of La Porte is proposing to add approximately 5.5 miles of new hike and bike trails to the existing 18- mile hike and bike trail system. These trails would connect 6 city parks along with a trail head located on Fairmont Parkway to allow access to the new trail system. Proposed trails would link parks from Wood Falls Park west to Spenwick Park, as well as Northwest Park south to Fairmont Parkway. Please see the future trails map located on page 4.20 in the attached Parks, Recreation and Open Space Master Plan.

 

Expected Impact:

These improvements are aligned with the goal of providing increased recreational opportunities for the public, by providing trail, parking drainage, public safety and other improvements to the neighborhood park.

Alternative Options:

The alternative option for this proposal would be to determine other funding or to complete

these items in house.

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: I: Increase access to safe, clean, and enjoyable green space.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  I1: Develop a countywide parks network and connectivity plan.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

 

 

 

 

Location: Trail 1: Woodfalls Park (3801 1/2 Driftwwod) to Fairmont Park (3540 Farrington) along drainage
ditch.
Trail 2: Fairmont @ Farrington to (3540 Farrington) along Big Island Slough. Trail 3: Fairmont Park

(3540 Farrington) to Norhtwest Park (10210 North P Street) along Big Island Slough. Trail 4: Spenwick Park

(9225 Carlow) to Creekmont Park (700 Willow Creek) Along the Tejas Gas Corridor Corp Right of Way. Trail 5:  Creekmont Park (700 Willow Creek) to Glen Meadows Park (801 Valleybrook) connecting to trail to be

build along Big Island Slough.

Address (if applicable): N/A

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund

$

$300,000.00

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$300,000.00

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 8/26/2025

Anticipated Implementation Date (if different from Court date): 8/26/2025

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Debjani Chakravarty, Director, Contracts and PMO, Office of the County Engineer.

Attachments (if applicable): Interlocal Agreement