Title: Request for approval of a certain project, decreeing the project to be a public necessity and convenience, directing the Harris County Real Property Division to acquire two (2) fee simple tracts for the public project known as Barrier Free HCTRA Program, for the purpose of roadway construction, Precincts 3 & 4.
Attachments: 1. 25-5807-Public Necessity-25050MF3VX01-Barrier Free HCTRA Program-9-18-25-P 3 & 4.pdf

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: Not applicable

 

Regular or Supplemental RCA: Regular RCA

 

Type of Request: Public Necessity

 

Project ID (if applicable): 25050MF3VX01

Vendor/Entity Legal Name (if applicable): Any applicable landowner and/or property interest holder

 

MWBE Contracted Goal (if applicable): Not applicable

MWBE Current Participation (if applicable): Not applicable

Justification for 0% MWBE Participation Goal:  N/A - Goal not applicable to request

 

Grant Indirect Costs Rate (if applicable): Not applicable

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a certain project, decreeing the project to be a public necessity and convenience, directing the Harris County Real Property Division to acquire two (2) fee simple tracts for the public project known as Barrier Free HCTRA Program, for the purpose of roadway construction, Precincts 3 & 4.

end

 

Background and Discussion:

The Barrier-Free HCTRA Program will provide for a modern, safer, and more efficient alternative to traditional toll booths where drivers must stop to pay workers by hand.  Barrier-Free HCTRA, on the other hand, automatically collects the usage fee or toll charged to vehicles using toll roads, HOV lanes, or toll bridges at the point of passage.  The Harris County Toll Road Authority (HCTRA) issues drivers an automated radio transponder device, called an EZ TAG, which is displayed on the vehicle’s windshield.  When the vehicle passes a roadside toll reader device, a radio signal from the reader scans the EZ TAG, which transmits back an identifying number that registers the vehicle’s use of the road, and an electronic payment system charges the user the toll.

 

The Barrier Free HCTRA Program will ultimately provide increased freeway capacity and additional safety improvements along the Sam Houston Tollway.  With the primary goals of the program to provide free flowing traffic, reducing congestion, and increasing safety, the project includes additional travel lanes, reconstruction of toll gantries, improved roadway drainage, bridge widening, new retaining walls, new signing and pavement markings, safety improvements at the frontage road intersections, and new fiber installation. 

 

This public necessity is being revised for the project to be acquired in the name of Harris County and not Harris County Toll Road Authority.

 

Expected Impact:

This project aligns Harris County’s goals of providing accessible, affordable, reliable, safe and sustainable transportation options and networks to facilitate efficient movement of people and goods throughout the region.

 

Alternative Options:

No other recommended solutions for this identified need.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F1: Strengthen the County’s commitment to Vision Zero principles and goals.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

8/26/2025

25-4906

Public Necessity

 

Location:

Address (if applicable): 8825 N Sam Houston Pkwy & 2110 W Sam Houston Pkwy, Houston, TX 77064 & 77043

Precinct(s): Precincts 3 & 4

 

Fiscal and Personnel Summary

Service Name

 

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$

$

$

Grants – Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget:

Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request:

Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 9/18/2025

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item

 

Contact(s) name, title, department: Michael Ware, Director, Office of County Engineer

 

Attachments (if applicable): Findings and Declarations; Metes and Bounds