Primary Department: Flood Control District
Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director
Secondary Department: N/A
Secondary Department Head/Elected Official: N/A
Regular or Supplemental RCA: Regular RCA
Type of Request: Transmittal
Project ID (if applicable): D518-03-00-E001
Vendor/Entity Legal Name (if applicable): Agha Engineering, LLC
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - Goal not applicable to request
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Transmittal by the Flood Control District of a preliminary engineering report by Agha Engineering, LLC dated June 30, 2025, and titled Keegans Stormwater Detention Basin (Brays Bayou Watershed, Bond ID F-07, Project ID D518-03-00-E001, Precinct 4).
end
Background and Discussion:
The purpose of this transmittal is to request the acceptance of the Preliminary Engineering Report (PER) titled Keegans Stormwater Detention Basin to continue with the full implementation of the project. This project is generally located along Keegans Bayou, near the confluence of D118-14-00, between Synott Road and S. Dairy Ashford in the City of Houston. The purpose of this project is to reduce flood risk to the Keegans Bayou watershed by reducing water surface elevations (WSELs) along Keegans Bayou near the D118-14-00 confluence. After evaluating three alternatives, alternative 1 was selected as the recommended alternative. It consists of three basin compartments providing 437 ac-ft of stormwater detention storage, as well as channel improvements along D118-14-00, and will be implemented in three phases. This project scores in the first quartile of the 2022 prioritization framework.
Expected Impact:
The project will provide 437 ac-ft of stormwater storage detention through three basin compartments, benefiting 560 structures, 300 acres, and 3.9 miles of roadway for the 100-year storm event.
Alternative Options:
The alternative should the PER not be approved is the Flood Control District will not be able to proceed with the full implementation of the project and flood risk will remain the same.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): H1: Complete and implement the Flood Resilience Plan.
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan: N/A
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
03/26/2024 |
202. |
Design Agreement |
|
05/16/2023 |
142. |
Preliminary Engineering Agreement |
|
08/23/2022 |
156. |
ATN |
Location: Synott and Old Richmond Road
Address (if applicable):
Precinct(s): Precinct 4
|
Fiscal and Personnel Summary |
|
Service Name |
N/A |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
$ |
$ |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
$ |
$ |
$ |
|
Grants - Proposed Budget (For Grants Items only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
|
Personnel (Fill out section only if requesting new PCNs) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
Anticipated Court Date: 10/16/2025
Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.
Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item
Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District
Attachments (if applicable): Map