Primary Department: Purchasing
Primary Department Head/Elected Official: Kimberly J. Williams, JD
Secondary Department: Flood Control District
Secondary Department Head/Elected Official: Marcus Stuckett
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Renewal
Project ID (if applicable): 250003
Vendor/Entity Legal Name (if applicable): LASS Engineering and Construction, Inc. (corrected) ECON Development, Inc. (as approved)
MWBE Contracted Goal (if applicable): 18.58%
MWBE Current Participation (if applicable): 100%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable):
Justification for 0% Grant Indirect Costs Rate (if applicable): Choose an item.
Request Summary (Agenda Caption):
title
Request for approval of a renewal option and to correct the vendor name from ECON Development, Inc. (as approved) to LASS Engineering and Construction, Inc. (corrected) for general drainage system repairs in South Harris County for the Flood Control District for the period of September 1, 2026 - August 31, 2027, at a cost of $6,000,000, and for the County Clerk to execute any applicable bonds to be received (250003), MWBE Contracted Goal: 18.58%, MWBE Current Participation: 100%.
end
Background and Discussion: Click or tap here to enter text.
The Project consists of General Repairs, for sites located throughout the southern portions of Harris County, Texas. Major emphasis of this Repair Contract will continue to be earthwork, including but not limited to erosion repair, slope failure repair, removal and disposal of sediment accumulations, granular fill and riprap installation, pipe removal and replacement, headwall and wingwall removal and replacement, concrete channel lining removal and replacement, concrete low-flow removal and replacement, outfall structure removal and replacement and related items. These services will provide support for infrastructure maintenance work
Expected Impact:
N/A
Alternative Options: Click or tap here to enter text.
N/A
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): N/A
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan:
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
1/23/2025 |
25-0428 |
Advertisement to Bid |
|
8/7/2025 |
25-4972 |
Approval of award to RES Gulf Coast LLC dba LECON, Inc. and ECON Development, Inc. |
|
9/18/2025 |
25-5810 |
Approval to terminate RES Gulf Coast LLC dba LECON, Inc. |
Location: N/A
Address (if applicable): N/A
Precinct(s): Countywide
|
Fiscal and Personnel Summary |
|
Service Name |
General Earthen and Concreate Channel Repairs (Countywide) for the Harris County Flood Control District |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Tax Revenue - FCD |
$ |
$6,000,000 |
$6,000,000 |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
$6,000,000 |
$6,000,000 |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
$6,000,000 |
$6,000,000 |
$ |
|
Grants - Proposed Budget (For Grants Items only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
|
Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
|
County Attorney’s Office Legal Review (for Harris County Code Items only) |
|
CAO Reviewer Name and Title |
|
CAO Review Completion Date |
Click or tap to enter a date. |
Anticipated Court Date: 7/30/2026
Anticipated Implementation Date: 9/1/2026
Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item
Contact(s) name, title, department: Dalton Krueger, Project Manager, HCFCD; Maria Heinzmann, Senior Buyer, Harris County Purchasing
Attachments (if applicable): Letter