Legislation Details

File #: 26-0928    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 1/29/2026 In control: Commissioners Court
On agenda: 2/12/2026 Final action: 2/12/2026
Title: Request for approval of a change in contract with Hassell Construction Group, LLC, in connection with Hidden Meadow Subdivision Drainage Improvements - 2018, with an addition in the amount of $211,868.88, Job No. 23/0127-2, UPIN 19101MF14N01, Precinct 1, MWBE Contracted Goal: 27%, MWBE Current Participation: 302.89%.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 23/0127, UPIN 19101MF14N01

Vendor/Entity Legal Name (if applicable): Hassell Construction Group, LLC

 

MWBE Contracted Goal (if applicable): 27%

MWBE Current Participation (if applicable): 302.89%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Hassell Construction Group, LLC, in connection with Hidden Meadow Subdivision Drainage Improvements - 2018, with an addition in the amount of $211,868.88, Job No. 23/0127-2, UPIN 19101MF14N01, Precinct 1, MWBE Contracted Goal: 27%, MWBE Current Participation: 302.89%.

end

 

Background and Discussion:

Hidden Meadow is in Northeast Harris County, Texas, Precinct 1. The subdivision is mainly composed of single-family homes and duplexes. The residents have experienced structural flooding during several recent flood events. Approximately 199 homes were reported to have flooded during Hurricane Harvey. The purpose of this project is to reduce flooding for homes within the subdivision. The proposed solution includes upgrading storm sewers and adding a detention pond.

 

The change in contract includes the following:

 

The line items have been adjusted to reconcile overrun and underrun quantities and to add any new items needed to complete the proposed scope of work.

 

•         The increase of quantities for existing line item 18 for an addition in the amount of $9,273.00 and 0 days.

•         The decrease of quantities for existing line items 20, 78, 79, 85, and 86 for a deduction in the amount of $65,088.75 and 0 days.

•         Added line item 95 - Removal of two Monuments at intersection of Hidden Rose Lane and Montclair Bend Lane for installation of Waterline for an addition in the amount of $1,127.37 and 0 days.

•         Added line item 96 - Water Line Fitting Failure & 2" Tap Conflict - (RFI - 21) for an addition in the amount of $9,220.55 and 0 days.

•         Added line item 97 - Valve Failure at Meadow Bend & Montclair - (RFI - 19) for an addition in the amount of $9,329.19 and 0 days.

•         Added line item 106 - TS&V in lieu of Wet Connect - Phase 1 WL - (RFI - 16) for an addition in the amount of $20,821.45 and 0 days.

•         Added line item 99 - Adding Insertion Valves Per MUD Engineer - (RFI - 14) for an addition in the amount of $74,676.69 and 0 days.

•         Added line item 98 - Water Line Relocation Due to CP Conflict - (RFI - 5) for an addition in the amount of $94,934.61 and 0 days.

•         Added line item 101 - Phase 1 Waterline Flushing Delay - (RFI - 12) for an addition in the amount of $41,448.92 and 0 days.

•         Added line item 102 - Relocate 8” waterline to avoid conflict with AT&T hand hole - (RFI - 07) for an addition in the amount of $16,125.85 and 0 days.

 

The above additions and deductions result in a net change in the amount of $211,868.88 and 0 calendar days.

 

Expected Impact:

This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in Hidden Meadow subdivision.

 

Alternative Options:

The County could elect to fund the requested task or choose to reject it. However, if not approved, the contractor will not be able to complete the scope of work.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H6: Expand neighborhood drainage programs.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

04/25/2023

329 (23-2276)

Transmittal - Advertisement

06/06/2023

241 (23-3183)

Contract Award - Hassell Construction Group, LLC

07/10/2025

18 (25-4181)

Contract Amendment (23/0127-1) for extension of project term

 

Location: Hidden Meadows subdivision, Houston, TX

Address (if applicable): N/A

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1080 - Infrastructure Fund

$

$211,868.88

$211,868.88

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$211,868.88

$211,868.88

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$211,868.88

$211,868.88

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 2/12/2026

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): Change in Contract (CIC)