File #: 25-2061    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 3/19/2025 In control: Commissioners Court
On agenda: 3/27/2025 Final action: 3/27/2025
Title: Request by the Office of the County Engineer for approval of an amendment to an agreement with Gunda Corporation, LLC, in the amount of $4,140.00 for additional Professional Engineering Services to provide improvements to Clay Road 1 west of Ventana Prairie Dr to west of Peek Road, UPIN 171033954823, Precinct 4.

Primary Department: County Engineer

Primary Department Head/Elected Official:  Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Supplemental RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 21/0357 UPIN171033954823

Vendor/Entity Legal Name (if applicable): Gunda Corporation, LLC.

 

MWBE Contracted Goal (if applicable): N/A

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - project was awarded prior to launch of County's M/WBE Program

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request by the Office of the County Engineer for approval of an amendment to an agreement with Gunda Corporation, LLC, in the amount of $4,140.00 for additional Professional Engineering Services to provide improvements to Clay Road 1 west of Ventana Prairie Dr to west of Peek Road, UPIN 171033954823, Precinct 4.

end

 

Background and Discussion:

Additional design work is necessary for an intersection redesign that was not ADA compliant for a new traffic signal. The signal is being built by Traffic Signal On-call contract. Precinct 4 requested the EOR for Clay Road 1 do the redesign work. Clay Road 1 is a road widening project in Precinct 4 from Peek Road to Ventana Prairie. The project consists of upgrading the roadway and drainage from a 2 lane asphalt road to a 4 lane asphalt boulevard section. The project was designed by Precinct 3 and handed over to Precinct 4 at the time of redistricting. The Engineer of Record needs to update the drawings to add an ADA compliant crossing for a future traffic signal. The signal was not warranted at the time of road construction so an on-call Traffic Signal Contractor is going to build the signal. Precinct 4 wants to use the Construction Phase Services contract of Clay Road 1 to complete the redesign work.

 

Expected Impact: 

The new design will allow us to build an ADA compliant crosswalk during the traffic signal construction. 

 

 

 

Alternative Options:

Without the redesign the signal will be constructed with no crosswalks.

 

County Strategic Plan Goal:  N/A

County Strategic Plan Objective: N/A

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  N/A

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

1/25/2022

54

Entered into Agreement for Construction Phase Services

 

Location:

Address (if applicable):  Clay Road from Peek to Ventana Prairie

Precinct(s): Precinct 4

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other 3021

$

$4,140.00

$4,140.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$4,140.00

$4,140.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$4,140.00

$4,140.00

$

Grants - Proposed Budget (To be filled out by Grants staff only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: 3/27/2025

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Engineering Department

 

Attachments (if applicable): County Auditor’s Form 1258B.