Legislation Details

File #: 26-7665    Version: 1 Name:
Type: Contract - Amendment Status: Agenda Ready
File created: 11/6/2026 In control: Commissioners Court
On agenda: 11/19/2026 Final action:
Title: Request for approval of a change in contract with Mar-Con Services, LLC, in connection with final construction of Miller Road 2 – Wallisville Road to US 90 - 2022, adding 267 calendar days, with an addition in the amount of $548,921.20, Job No. 23/0443-1, UPIN 22101MF2CW01, Precinct 1, MWBE Contracted Goal: 32%, MWBE Current Participation: 100%.
Attachments: 1. 26-7665-CIC-22101MF2CW01-Miller Rd 2-23-0443-1.Final-MarCon Svcs-P1-11192026.pdf
Date Ver.Action ByActionResultAction DetailsMeeting DetailsVideo
No records to display.

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 23/0443, UPIN 22101MF2CW01

Vendor/Entity Legal Name (if applicable): Mar-Con Services, LLC

 

MWBE Contracted Goal (if applicable): 32%

MWBE Current Participation (if applicable): 100%

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Mar-Con Services, LLC, in connection with final construction of Miller Road 2 - Wallisville Road to US 90 - 2022, adding 267 calendar days, with an addition in the amount of $548,921.20, Job No. 23/0443-1, UPIN 22101MF2CW01, Precinct 1, MWBE Contracted Goal: 32%, MWBE Current Participation: 100%.

end

 

Background and Discussion:

Harris County intends to provide improvements to Miller Road 2, from Wallisville Road to US 90.  The pavement is planned to be re-constructed from asphalt to concrete pavement.

 

Change order includes the following items:

PCO - 4 RFI#024 - Electro Quip Cost Est - (RFI - 24)                                                               $28,932.22                     zero calendar days

PCO - 6 RFI#029 - Guardrail Issues (at Kimberlee Street) - (RFI - 29) $2,884.70                     2 calendar days

PCO - 8 RFI#032 - 5in Slope Paving - (RFI - 32)                                                                $5,827.00                     15 calendar days

PCO - 9 Final       - Miller Road 2 - Wallisville Road to US 90 - 2022                      $509,822.68                     zero calendar days

PCO - 5 RFI#028 - Concrete Barrier - (RFI - 28)                                                                $1,454.60                     zero calendar days

PCO - 7 RFI#026 - Project Delays - (RFI - 26)                                                                                     $0.00                                          250 calendar days

 

 

 

Expected Impact:

The unobstructed visibility easement will allow us to move forward with the proposed improvements for the intersection of Miller Road-2 and Miller Road-1 to provide more turning area for the trucks and make sure there is enough visibility for the crossing traffic.

 

Alternative Options:

No other options, the proposed infrastructure is needed to complete the project.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  F1: Strengthen the County’s commitment to Vision Zero principles and goals.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

02/27/2024

354 (24-1164)

Contract Award

 

Location:

Address (if applicable):

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other                                                3109

$

$548,921.20

$548,921.20

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$548,921.20

$548,921.20

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$548,921.20

$548,921.20

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 11/19/2026

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, PE, CFM, Chief of Engineering and Architectural Services, Harris County Office of the County Engineer

 

Attachments (if applicable): County Auditor’s Form 1258B