Legislation Details

File #: 26-1239    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 2/11/2026 In control: Commissioners Court
On agenda: 2/26/2026 Final action: 2/26/2026
Title: Request for approval of an amendment to an agreement with Infrastructure Engineering, Inc. in the amount of $244,032.00 for Professional Engineering Services in connection with Hafer Road improvements from FM 1960 to Skywood Drive, UPIN 25101MF3N301, Precinct 1, MWBE Contracted Goal: 19.6%.
Sponsors: Mony Hossain

Primary Department: County Engineer

Primary Department Head/Elected Official: Milton Rahman, PhD, P.E, PMP, CFM, ENV SP, County Engineer

 

Secondary Department: Commissioner, Precinct 1

Secondary Department Head/Elected Official: Rodney Ellis, Commissioner

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): UPIN 25101MF3N301

Vendor/Entity Legal Name (if applicable): Infrastructure Engineering, Inc.

 

MWBE Contracted Goal (if applicable): 19.6%

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of an amendment to an agreement with Infrastructure Engineering, Inc. in the amount of $244,032.00 for Professional Engineering Services in connection with Hafer Road improvements from FM 1960 to Skywood Drive, UPIN 25101MF3N301, Precinct 1, MWBE Contracted Goal: 19.6%.

end

 

Background and Discussion:

Hafer Road is a local collect roadway.  The project is to convert 1 mile 2-lane asphalt roadway with ditches to a 2-lane concrete roadway with storm sewer and sidewalk/share-use-path from FM 1960 to Skywood Lane. The amendment is to perform the community engagement, roundabout design at Butterfield Road intersection, additional sidewalk and other traffic calming options.

 

Expected Impact:

The proposed improvements will provide safe conditions for vehicles and pedestrians traffic based on the community input.

 

Alternative Options:

No alternative options. Project would lack public input information.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  G1: Expand pedestrian and cyclist infrastructure on County-managed roads,

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan:

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

06/12/2025

75

Professional Services Agreement

 

 

 

 

Location: Hafer Road from FM 1960 to Skywood Drive, Houston, TX 77090

Address (if applicable): N/A

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other

$

$244,032.00

$ 244,032.00

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$244,032.00

$ 244,032.00

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

 $244,032.00

$244,032.00

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 2/26/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services

 

Attachments (if applicable):  Contract and Exhibits