Legislation Details

File #: 24-2906    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 4/30/2024 In control: Commissioners Court
On agenda: 6/4/2024 Final action: 6/4/2024
Title: Request for approval of a change in contract with Allgood Construction Co., Inc., in connection with W. Gulf Bank Road from I45 to Airline Drive, adding 98 calendar days, with an addition in the amount of $56,525.83, Job No. 22/0461-3, UPIN 19101MF0XV01, Precinct 2, MWDBE Contracted Goal: 25%, MWDBE Current Participation: 59.11%.
Sponsors: Mony Hossain

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 22/0461, UPIN 19101MF0XV01

Vendor/Entity Legal Name (if applicable): Allgood Construction Co., Inc

 

MWDBE Contracted Goal (if applicable): 25%

MWDBE Current Participation (if applicable): 59.11%

Justification for 0% MWDBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with Allgood Construction Co., Inc., in connection with W. Gulf Bank Road from I45 to Airline Drive, adding 98 calendar days, with an addition in the amount of $56,525.83, Job No. 22/0461-3, UPIN 19101MF0XV01, Precinct 2, MWDBE Contracted Goal: 25%, MWDBE Current Participation: 59.11%.

end

 

Background and Discussion:

This project includes the construction of four 11-foot-wide concrete pavement with a 24-foot median, and 8-foot-wide sidewalk along both sides West Gulf Bank Road from Interstate 45 Freeway to Airline Drive.  It also includes the drainage improvements.

 

The change order includes the following:

-                     Replacing 360 linear feet of 10” pipe and adding 80 Linear Feet of 10-inch Polyvinyl Chloride pipe, installation of a 4-foot manhole.  This change will add $42,940.41 and additional 86 days to the contract.

 

-                     Installing 8 linear feet of 18” reinforced concrete pipe, pouring a collar between existing reinforced concrete pipe and proposed reinforced concrete box. This change will add $6,576.07 and additional 2 days to the contract.

 

-                     The delays in project progress during the period from January 15, 2024, to January 28, 2024, were primarily attributed to adverse weather conditions, specifically freezing temperatures, and heavy rainfall, which hindered travel to the site, material delivery, and halted work due to wet site conditions. The extension requests for both freezing weather conditions and heavy rainfall were evaluated and approved in accordance with item 5.27.  This change will add additional 9 days to the contract.

-                     Three sewer services leads will be reconnected to the proposed 10" sanitary sewer line, while one lead will be disconnected and capped. This change will add $7,009.35 and additional 1 day to the contract.

 

Expected Impact:

Increase the total cost for the contract and adding additional days to the contract time.

 

Alternative Options:

No action will result in substandard construction.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

x Transportation

_ Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

03/14/2023

217

Contract Award

10/10/2023

54

Contract Amendment for additional funds and extension of project term

01/09/2024

19

Contract Amendment for additional funds and extension of project term

 

Location:

Address (if applicable):

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Other Funds 3021, 3109

$

$56,525.83

$56,525.83

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$56,525.83

$56,525.83

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$56,525.83

$56,525.83

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: June 04, 2024

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

Contact(s) name, title, department: Erwin Burden, PE, Senior Director of Capital Projects Infrastructure, Harris County Engineering Department

Attachments (if applicable): County Auditor’s Form 1258B