File #: 24-5677    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 9/5/2024 In control: Commissioners Court
On agenda: 9/19/2024 Final action: 9/19/2024
Title: Request for approval of a change in contract with C.E. Barker Ltd., in connection with Western Homes Addition Subdivision Drainage Improvements - 2018, adding eight calendar days, Job No. 22/0425-2, Grant Fund, UPIN 20102MF1E501, Precinct 2, MWDBE Contracted Goal: 30.6%, MWDBE Current Participation: 32.67%.

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): UPIN - 20102MF1E501 - Job No. 22/0425

Vendor/Entity Legal Name (if applicable): C.E. Barker Ltd.

 

MWDBE Contracted Goal (if applicable): 30.6%

MWDBE Current Participation (if applicable): 32.67%

Justification for 0% MWDBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with C.E. Barker Ltd., in connection with Western Homes Addition Subdivision Drainage Improvements - 2018, adding eight calendar days, Job No. 22/0425-2, Grant Fund, UPIN 20102MF1E501, Precinct 2, MWDBE Contracted Goal: 30.6%, MWDBE Current Participation: 32.67%.

end

 

Background and Discussion:

The location of the work is in the Western Homes Subdivision is in the Halls Bayou Watershed. The proposed improvements include installation of new storm sewer system, roadway paving, driveway paving, widening and regrading of existing roadside ditches, and detention pond improvements.

 

                     The Change in contract is needed to reconcile the overrunning items with the underrunning items and adding a new line item to the contract. Below is a summary of changes:

 

                     New Hydro mulch Line Items: Added line item # 117 for Hydro mulch seeding at detention pond for an additional cost in the amount of $33,969.00 and 8 calendar days.

 

                     Quantity Adjustment: The items are adjusted to reconcile overrun and underrun quantities on the project. The increase of quantities on asphalt paving items, trench drains, mailbox and concrete walkways (items 3, 8, 12, 30, 35, and 38) for an addition in the amount of $178,282.33.  The decrease of quantities on underrun line items (Items 5, 13, 18, 29 and 32) for a deduction in the amount of $212,251.33.

 

                     The above additions and deductions result in a net change in the amount of $0.00 and 8 calendar days.

 

Expected Impact:

This project seeks to reduce flooding and strengthen resiliency in Harris County by assisting in the alleviation of structural flood damage to homes in the Western Homes Addition subdivision.

 

Alternative Options:

The County could elect to fund the requested task or choose to reject it. However, if not approved, the contractor will not be able to complete the scope of work.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

X Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

03/14/2023

23-1760

Award of Construction Contract- C.E. Barker Ltd.

12/05/2023

23-6962

Contract Amendment (22/0425-01) for additional funds and extension to project term - Bond

04/23/2024

24-2242

Contract Amendment (24/0425-02) for additional funds and extension to project term - Bond

06/04/2024

24-3117

Contract Amendment (24/0425-01) for extension of project term - Grant

 

Location: Western Homes Addition Drainage Subdivision, Aldine, Texas

Address (if applicable): N/A

Precinct(s): Precinct 2

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$

$

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$

$

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: September 19, 2024

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Erwin Burden, P.E., CFM, Senior Director of Capital Project Infrastructure, Harris County Engineering Department

 

Attachments (if applicable): Change in Contract (CIC)