Title: Request for approval to negotiate with A&R Engineering and Testing, Inc. for Professional Engineering Services regarding Construction Materials Testing and related Services for Miller Road 2 - Wallisville Road to US 90 - 2022, UPIN 22101MF2CW01, Precinct 1.
Sponsors: Mony Hossain

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Negotiation

 

Project ID (if applicable): UPIN - 22101MF2CW01

Vendor/Entity Legal Name (if applicable): A&R Engineering and Testing, Inc.

 

MWDBE Contracted Goal (if applicable): N/A

MWDBE Current Participation (if applicable): N/A

Justification for 0% MWDBE Participation Goal:  N/A - Goal not applicable to request

 

Request Summary (Agenda Caption):

title

Request for approval to negotiate with A&R Engineering and Testing, Inc. for Professional Engineering Services regarding Construction Materials Testing and related Services for Miller Road 2 - Wallisville Road to US 90 - 2022, UPIN 22101MF2CW01, Precinct 1.

end

 

Background and Discussion:

 

This project is a re-design of 2 lanes of roadway equaling 20,000 linear feet of pavement from the existing asphaltic concrete pavement to jointed concrete pavement, and the stabilization of the existing insitu soil subgrade. A&R Engineering and Testing, Inc. will provide construction materials testing services to support the project in construction.

 

Expected Impact:

 

This agreement will allow the firm to conduct field and laboratory testing on soil, concrete, asphalt and various other construction materials to ensure the material’s compliance with Harris County Engineering Department’s adopted standards and specifications as required by state law.

 

Alternative Options:

 

Construction materials testing is required by state law.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing

_ Public Health

X Transportation

_ Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any): N/A

Date

Agenda Item #

Action Taken

 

 

 

 

Location:

Address (if applicable): Miller Road - Wallisville Road to US 90.

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Professional Services - CMT

 

FY 24

FY 25

Next 3 FYs

Incremental Expenditures (do NOT write values in thousands or millions)

Labor Expenditures

$

$

$

Non-Labor Expenditures

$

$

$

Total Incremental Expenditures

$

$

$

Funding Sources (do NOT write values in thousands or millions)

Existing Budget

Choose an item.

$

$

$

Choose an item.

$

$

$

Choose an item.

$

$

$

Total Current Budget

$

$

$

Additional Budget Requested

Choose an item.

$

$

$

Choose an item.

$

$

$

Choose an item.

$

$

$

Total Additional Budget Requested

$

$

$

Total Funding Sources

$

$

$

Personnel (Fill out section only if requesting new PCNs)

Current Position Count for Service

-

-

-

Additional Positions Requested

-

-

-

Total Personnel

-

-

-

 

Anticipated Court Date: November 14, 2023

Anticipated Implementation Date (if different from Court date): N/A

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

Contact(s) name, title, department: Dr. Hatem Bastawisy, PE, (Interim) Senior Director of Project Delivery, HCED

 