Legislation Details

File #: 26-2946    Version: 1 Name:
Type: Contract - Award Status: Passed
File created: 4/30/2026 In control: Commissioners Court
On agenda: 5/14/2026 Final action: 5/14/2026
Title: Request for approval of an agreement with Cascade Civil Services, LLC, in the amount of $1,000,000, to provide preliminary engineering, design, bidding, and construction phase engineering services in support of Telge Stormwater Detention Basin at Pleasant Grove Road (Cypress Creek Watershed, Bond ID Z-04, Project ID K500-28-00-E001, Agreement No. 2024-64, Precinct 3, MWBE Contracted Goal: 19.60%).
Attachments: 1. 051426 AGMT CASCADE 2024-64 PCT 3 backup.pdf

Primary Department: Flood Control District

Primary Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director

 

Secondary Department: N/A

Secondary Department Head/Elected Official: N/A

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Award

 

Project ID (if applicable): K500-28-00-E001

Vendor/Entity Legal Name (if applicable): Cascade Civil Services, LLC

 

MWBE Contracted Goal (if applicable): 19.60%

MWBE Current Participation (if applicable): N/A

Justification for 0% MWBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Grant Indirect Costs Rate (if applicable): N/A

Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item

 

Request Summary (Agenda Caption):

title

Request for approval of an agreement with Cascade Civil Services, LLC, in the amount of $1,000,000, to provide preliminary engineering, design, bidding, and construction phase engineering services in support of Telge Stormwater Detention Basin at Pleasant Grove Road (Cypress Creek Watershed, Bond ID Z-04, Project ID K500-28-00-E001, Agreement No. 2024-64, Precinct 3, MWBE Contracted Goal: 19.60%).

end

 

Background and Discussion:

The limits are marked along HCFCD Unit K100-00-00 and located at the Cypress Creek Watershed along the channel K100-00-00, near the intersection of Whispering Valley Dr and Telge Road. This Agreement will provide preliminary engineering. This project has been identified in the Cypress Creek Implementation Plan, and the PER associated with this project will determine the benefits and geometry for the proposed stormwater detention basin. This project occurs in the 2nd quartile under the 2022 Prioritization Framework approved by Commissioners Court.

 

Expected Impact:

The project seeks to reduce flood risks and strengthen resiliency in the Cypress Creek watershed by helping to mitigate overland sheet flow, overbank flooding, insufficient drainage capacity, overflows from neighboring catchments, and tailwater influence from Cypress Creek.

 

Alternative Options:

The alternative to approving this item would be placed on hold until funding is acquired for construction and design and PER which would result in no project.

 

County Strategic Plan Goal:  2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.

County Strategic Plan Objective: H: Improve the condition and resilience of County transportation, flood control, and other infrastructure.

Justice/Safety Initiative (Goal 1):  N/A

Infrastructure Initiative (Goal 2):  H1: Complete and implement the Flood Resilience Plan.

Economy Initiative (Goal 3): N/A

Health Initiative (Goal 4): N/A

Climate/Resilience Initiative (Goal 5): N/A

Housing Initiative (Goal 6): N/A

 

Additional notes related to the Strategic Plan: N/A

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

09/19/2024

158.

ATN

 

Location: Confluence of Telge Road and HCFCD Unit K100-00-00

Address (if applicable):

Precinct(s): Precinct 3

 

Fiscal and Personnel Summary

Service Name

4.a.3 - Engineering Services

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

Bonds

$

$1,000,000

$1,000,000

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Existing Budget

$

$1,000,000

$1,000,000

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Sources

$

$1,000,000

$1,000,000

$

Grants - Proposed Budget (For Grants Items only)

 

Labor

Non-Labor

Total

No. of Grant Years

Local Match Source - Existing Budget: Choose an item.

$

$

$

 

Local Match Source - Additional Budget Request: Choose an item.

$

$

$

 

Grant Funds Applied for/Awarded (Total)

$

$

$

 

Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

County Attorney’s Office Legal Review (for Harris County Code Items only)

CAO Reviewer Name and Title

 

CAO Review Completion Date

Click or tap to enter a date.

 

Anticipated Court Date: 5/14/2026

Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

 

Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District

 

Attachments (if applicable): Agreement and Map