Department: Flood Control District
Department Head/Elected Official: Tina Petersen, Ph.D., P.E., Executive Director
Regular or Supplemental RCA: Regular RCA
Type of Request: Transmittal
Project ID (if applicable): L500-06-00-E001
Vendor/Entity Legal Name (if applicable): Civitas Engineering Group formerly KIT Professionals, Inc.
MWDBE Contracted Goal (if applicable): N/A
MWDBE Current Participation (if applicable): N/A
Justification for 0% MWDBE Participation Goal: N/A - Goal not applicable to request
Request Summary (Agenda Caption):
title
Transmittal by the Flood Control District of a preliminary engineering report prepared by Civitas Engineering Group formerly KIT Professionals, Inc. and dated August 1, 2023, titled Mueschke East Stormwater Detention Basin L500-06-00-E001 Final Preliminary Engineering Report. (Little Cypress Creek Watershed, Bond ID F-29, Project ID L500-06-00-E001, Precincts 3 and 4).
end
Background and Discussion:
The purpose of the Preliminary Engineering Report (PER) was to examine potential design alternatives for the Mueschke East Stormwater Detention basin that will add channel and stormwater detention capacity to provide water to surface elevation reduction within the Little Cypress Creek watershed. This basin is one of nine regional stormwater detention basins that are part of the flood risk mitigation strategies of the Little Cypress Creek Frontier Program.
Expected Impact:
The acceptance of this PER will allow the Flood Control District to move into the design engineering stage of this project.
Alternative Options:
N/A
Alignment with Goal(s):
_ Justice and Safety
_ Economic Opportunity
_ Housing
_ Public Health
_ Transportation
X Flooding
_ Environment
_ Governance and Customer Service
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
1/7/2020 |
2.b.5 |
ATN |
|
6/30/2020 |
2.b.13 |
Agreement |
Location: Along L100-00-00 between Cypress Rosehill Road and Mueschke Road
Address (if applicable):
Precinct(s): Precincts 3 & 4
|
Fiscal and Personnel Summary |
|
Service Name |
N/A |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Current Budget |
$ |
$ |
$ |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Request |
$ |
$ |
$ |
$ |
|
Personnel (Fill out section only if requesting new PCNs) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
Anticipated Court Date: June 25, 2024
Anticipated Implementation Date (if different from Court date):
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Yesenia Martinez, Commissioners Court Coordinator, Flood Control District
Attachments (if applicable): Map