File #: 24-2706    Version: 1 Name:
Type: Contract - Amendment Status: Passed
File created: 4/24/2024 In control: Commissioners Court
On agenda: 5/7/2024 Final action: 5/7/2024
Title: Request for approval of a change in contract with DVL Enterprises, LLC, in connection with final construction of Sidewalk and Bike Ln - Almeda Road (FM521) - 2020, with an addition in the amount of $144,430.69, Job No. 22/0013-2, UPIN 20101MF1KM01, Precinct 1, MWDBE Contracted Goal: 14%, MWDBE Current Participation: 49.30%.
Sponsors: Mony Hossain

Department: County Engineer

Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer

 

Regular or Supplemental RCA: Regular RCA

Type of Request: Contract - Amendment

 

Project ID (if applicable): Job No. 22/0013, UPIN 20101MF1KM01

Vendor/Entity Legal Name (if applicable): DVL Enterprises, LLC

 

MWDBE Contracted Goal (if applicable): 14%

MWDBE Current Participation (if applicable): 49.30%

Justification for 0% MWDBE Participation Goal:  N/A - Goal is not 0% and is listed above

 

Request Summary (Agenda Caption):

title

Request for approval of a change in contract with DVL Enterprises, LLC, in connection with final construction of Sidewalk and Bike Ln - Almeda Road (FM521) - 2020, with an addition in the amount of $144,430.69, Job No. 22/0013-2, UPIN 20101MF1KM01, Precinct 1, MWDBE Contracted Goal: 14%, MWDBE Current Participation: 49.30%.                     

end

 

Background and Discussion:

Project includes the construction of a sidewalk along Almeda Road between Old Spanish Trail and Holly Hall Street.

 

Change includes:

•                     New item for SWPPP Monthly Maintenance - protection of storm water runoff, reporting, etc. is a requirement of the project.  Item was not included in the original bid items for the project. SWPPP Inspection and Maintenance - 5 months at $600/month - $3,000.00, 0 DAYS.

•                     Escalation rate adjustment for Item 22-Concrete Sidewalk (9”) = $1,857.68, 0 days

•                     Escalation rate adjustment for Item 21-Curb Ramps (TY 20”) = $114.87, 0 days

•                     Escalation rate adjustment for Item 20- Curb Ramps (TY 7) = $826.57, 0 days

•                     Escalation rate adjustment for Item 19- Curb Ramps (TY 5) = $981.32, 0 days

•                     Escalation rate adjustment for Item 18- Curb Ramps (TY 1) = $171.60, 0 days

•                     Escalation rate adjustment for Item 17-Concrete Sidewalk (8”) = $20,714.04, 0 days

•                     Escalation rate adjustment for Item 16-Concrete Sidewalk (4.5”) = $383.49, 0 days

•                     Escalation rate adjustment for Item 15-Concrete Driveways = $6,527.01, 0 days

•                     Final Cost Adjustment = $109,854.11

•                     Total Additional Change = $144,430.69

 

 

Expected Impact:

Changes allow project to be completed in accordance with original intent of the project and in compliance with standards.

 

Alternative Options:

Reduce the scope of the project to avoid areas with existing conflicts and issues caused by existing field conditions.

 

Alignment with Goal(s):

_ Justice and Safety

_ Economic Opportunity

_ Housing                     

_ Public Health

x Transportation

_ Flooding

_ Environment

_ Governance and Customer Service

 

Prior Court Action (if any):

Date

Agenda Item #

Action Taken

03/22/2022

167

Contract Award

09/19/2023

107

Contract Amendment for additional funds and extension of project term

 

Location:

Address (if applicable):

Precinct(s): Precinct 1

 

Fiscal and Personnel Summary

Service Name

Engineering

 

 

Current Fiscal Year Cost

Annual Fiscal Cost

 

Labor

Non-Labor

Total

Recurring Expenses

Funding Sources

 

Existing Budget

 

 

 

 

1070 - Mobility Fund

$

$144,430.69

$144,430.69

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Current Budget

$

$144,430.69

$144,430.69

$

Additional Budget Request (Requires Fiscal Review Request Form)

 

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Choose an item.

$

$

$

$

Total Additional Budget Request

$

$

$

$

Total Funding Request

$

$144,430.69

$144,430.69

$

Personnel (Fill out section only if requesting new PCNs)

 

Current Position Count for Service

-

-

-

-

Additional Positions Request

-

-

-

-

Total Personnel

-

-

-

-

 

Anticipated Court Date: May 07, 2024

Anticipated Implementation Date (if different from Court date): N/A

 

Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item

Contact(s) name, title, department: Erwin Burden, PE, Senior Director of Capital Project Infrastructure, Harris County Engineering Department

Attachments (if applicable): County Auditor’s Form 1258B