Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, ENV SP, County Engineer
Secondary Department: Commissioner, Precinct 3
Secondary Department Head/Elected Official: Tom S. Ramsey, P.E., Commissioner
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Award
Project ID (if applicable): UPIN - 25103MF3VP01
Vendor/Entity Legal Name (if applicable): HDR Engineering, Inc.
MWBE Contracted Goal (if applicable): 2.77%
MWBE Current Participation (if applicable): 0%
Justification for 0% MWBE Participation Goal: N/A - Goal is not 0% and is listed above
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval to execute an agreement with HDR Engineering, Inc. in the amount of $1,160,565.81 for Professional Engineering and related services in connection with Design Phase Services of Holderrieth Rd Segment 4 - from Sir Alex Dr to SH 99 - 2025, UPIN 25103MF3VP01, Precinct 3, MWBE Contracted Goal 2.77%.
end
Background and Discussion:
Precinct 3 is requesting that the Office of the County Engineer enter into an agreement for professional engineering services to provide design-phase services for the subject roadway project. The project consists of the design of Holderrieth Road Segment 4, from Sir Alex Drive to State Highway 99. The recommended solution includes a four-lane concrete curb-and-gutter boulevard with 32-foot raised medians within 100-foot right-of-way. The scope of work includes the design of the roadway, storm sewer system, traffic signals or signal modifications (as warranted), a new bridge at Willow Creek M100-00-00 and all necessary appurtenances within the 100-foot right-of-way.
Expected Impact:
HDR Engineering, Inc. will provide the additional engineering services required for the project. Completion of the design and construction of the subject project will improve mobility and enhance access to major highways for the surrounding community.
Alternative Options:
An alternative to the proposed project would be the no-build option, which would leave the corridor without a constructed roadway. This would limit access, restrict mobility, and hinder planned development in the area.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: F: Ensure safety and security for all using the county’s transportation network in alignment with the County’s Vision Zero plan.
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): F1: Strengthen the County’s commitment to Vision Zero principles and goals.
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan:
Prior Court Action (if any): N/A- Vendor Pool Selection
|
Date |
Agenda Item # |
Action Taken |
|
|
|
|
Location:
Address (if applicable): Holderrieth Rd & Hufsmith-Kohrville Rd Tomball, Texas 77375
Precinct(s): Precinct 3
|
Fiscal and Personnel Summary |
|
Service Name |
Engineering |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
1070 - Mobility Fund |
$ |
$ 1,160,565.81 |
$ 1,160,565.81 |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
$ 1,160,565.81 |
$ 1,160,565.81 |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
$ 1,160,565.81 |
$ 1,160,565.81 |
$ |
|
Grants - Proposed Budget (For Grants Items only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
|
Personnel (Fill out section only if requesting new PCNs) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
|
County Attorney’s Office Legal Review (for Harris County Code Items only) |
|
CAO Reviewer Name and Title |
|
CAO Review Completion Date |
Click or tap to enter a date. |
Anticipated Court Date: 5/14/2026
Anticipated Implementation Date (if different from Court date): Click or tap to enter a date.
Emergency/Disaster Recovery Note: Not an emergency, disaster, or ARPA related item
Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services, Office of the County Engineer
Attachments (if applicable): Contract Exhibits and Agreement