Primary Department: County Engineer
Primary Department Head/Elected Official: Milton Rahman, PhD, P.E., PMP, CFM, County Engineer
Secondary Department: Commissioner, Precinct 3
Secondary Department Head/Elected Official: Tom S. Ramsey, P.E., Commissioner
Regular or Supplemental RCA: Regular RCA
Type of Request: Contract - Amendment
Project ID (if applicable): 15104M23NP03
Vendor/Entity Legal Name (if applicable): HR Green, Inc.
MWBE Contracted Goal (if applicable): N/A
MWBE Current Participation (if applicable): N/A
Justification for 0% MWBE Participation Goal: N/A - project was awarded prior to launch of County's M/WBE Program
Grant Indirect Costs Rate (if applicable): N/A
Justification for 0% Grant Indirect Costs Rate (if applicable): N/A - Not a grant item
Request Summary (Agenda Caption):
title
Request for approval of an amendment to an agreement with HR Green, Inc., in the amount of $6,829.94 for Professional Engineering Services in connection with Hufsmith-Kohrville Rd 3, UPIN 15104M23NP03, Precinct 3 (previously Precinct 4).
end
Background and Discussion:
The County executed an Agreement for Professional Engineering Services with HR Green, Inc. on March 10, 2015, and now seeks to amend the agreement for the tenth time. Harris County previously exchanged two (2) tracts of land with the City of Tomball to facilitate the development of Hufsmith-Kohrville Road, Segment 3B, from 400 feet north of Boudreaux Road to 600 feet north of Holderrieth Road, which includes the bridge crossing at Willow Creek. Following completion of the design, Harris County determined that the two tracts needed to be re-acquired to accommodate a longer and wider bridge, as required by the Harris County Flood Control District. As a result, the metes and bounds descriptions for both tracts must be revised to reflect the new nomenclature. This amendment will authorize HR Green, Inc. to revise the two (2) metes and bounds descriptions accordingly.
Expected Impact:
This action will allow the firm to perform the necessary actions to revise and update the two (2) Metes & Bound tracts.
Alternative Options:
The alternative is to not revise the plans, and the plans will not be compatible with the needs of the adjacent project segment.
County Strategic Plan Goal: 2. Connect our community with safe, reliable, equitably distributed, and well-maintained infrastructure.
County Strategic Plan Objective: N/A
Justice/Safety Initiative (Goal 1): N/A
Infrastructure Initiative (Goal 2): N/A
Economy Initiative (Goal 3): N/A
Health Initiative (Goal 4): N/A
Climate/Resilience Initiative (Goal 5): N/A
Housing Initiative (Goal 6): N/A
Additional notes related to the Strategic Plan:
Prior Court Action (if any):
|
Date |
Agenda Item # |
Action Taken |
|
03/10/2015 |
1.a.2. b.6 |
Professional Engineering Services for the study, design and bid phases for the construction of Hufsmith-Kohrville Road from 500’ north of Ezekiel Road to just south of Holderrieth Road as a four-lane concrete boulevard section, UPIN 15104M23NP03, Precinct 4 |
|
09/27/2016 |
1.a.2. c.4 |
Amendment No. 1 Professional Engineering Services for the study, design and bid phases for the construction of Hufsmith-Kohrville Road from 500’ north of Ezekiel Road to just south of Holderrieth Road as a four-lane concrete boulevard section, UPIN 15104M23NP03, Precinct 4 |
|
05/25/2021 |
52 |
Recommendation that the County Judge execute an addendum to an agreement with HR Green, Inc., in the amount of $111,972 to increase the limit of appropriation available in order that the County Engineer may authorize the Engineer to perform further Professional Engineering Services for improvements to Hufsmith-Kohrville Road 3, UPIN 15104M23NP03, Precinct 4. |
|
09/14/2021 |
58 |
Request for approval to execute an addendum to an agreement with HR Green, Inc., in the amount of $16,166.50 to perform further Professional Engineering Services for improvements to Hufsmith-Kohrville Rd 3, Precinct 4. |
|
01/25/2022 |
61 |
Request for approval to execute an amendment with HR Green, Inc. in the amount of $16,509.25 for Professional Engineering Services to provide improvements to Hufsmith-Kohrville Road 3, UPIN 15104M23NP03, Precinct 4. |
|
12/13/2022 |
47 |
Request for approval to execute an amendment with HR Green, Inc. in the amount of $434,156.87 for Professional Engineering Services in connection with Hufsmith-Kohrville Road 3, UPIN 15104M23NP03, Precinct 3 (project was awarded prior to launch of County’s M/WBE Program). |
|
03/14/2023 |
28 |
Request for approval to execute an amendment with HR Green, Inc. in the amount of $704,047.37 for Professional Engineering Services to provide improvements to Hufsmith-Kohrville Road 3, UPIN 15104M23NP03, Precinct 3 (project was awarded prior to launch of County’s M/WBE Program). |
|
02/27/2024 |
54 |
Request for approval to execute an amendment with HR Green, Inc. in the amount of $48,907.00 for Professional Engineering Services in connection with Hufsmith-Kohrville Rd 3, UPIN 15104M23NP03, Precinct 3 (previously Precinct 4), Justification for 0% MWDBE Participation Goal: N/A - project was awarded prior to launch of County’s M/WBE Program. |
|
3/26/2024 |
59 |
Request for approval to execute an amendment with HR Green, Inc. in the amount of $170,983.50 for Professional Engineering Services in connection with Hufsmith-Kohrville Rd 3, UPIN 15104M23NP03, Precinct 3 (previously Precinct 4), Justification for 0% MWDBE Participation Goal: N/A - project was awarded prior to launch of County's M/WBE Program. |
|
02/26/2026 |
40 |
Request for approval of an amendment to an agreement with HR Green, Inc. in the amount of $51,000.00 for Professional Engineering Services in connection with Hufsmith-Kohrville Rd 3, UPIN 15104M23NP03, Precinct 3 (previously Precinct 4), Justification for 0% MWBE Participation Goal: N/A - project was awarded prior to launch of County's M/WBE Program. |
|
|
|
|
Location:
Address (if applicable): Hufsmith-Kohrville Rd 3
Precinct(s): Precinct 3
|
Fiscal and Personnel Summary |
|
Service Name |
Engineering |
|
|
|
Current Fiscal Year Cost |
Annual Fiscal Cost |
|
|
Labor |
Non-Labor |
Total |
Recurring Expenses |
|
Funding Sources |
|
|
Existing Budget |
|
|
|
|
|
1070 - Mobility Fund |
$ |
$6,829.94 |
$6,829.94 |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Existing Budget |
$ |
$6,829.94 |
$6,829.94 |
$ |
|
Additional Budget Request (Requires Fiscal Review Request Form) |
|
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Choose an item. |
$ |
$ |
$ |
$ |
|
Total Additional Budget Request |
$ |
$ |
$ |
$ |
|
Total Funding Sources |
$ |
$6,829.94 |
$6,829.94 |
$ |
|
Grants - Proposed Budget (For Grants Items only) |
|
|
Labor |
Non-Labor |
Total |
No. of Grant Years |
|
Local Match Source - Existing Budget: Choose an item. |
$ |
$ |
$ |
|
|
Local Match Source - Additional Budget Request: Choose an item. |
$ |
$ |
$ |
|
|
Grant Funds Applied for/Awarded (Total) |
$ |
$ |
$ |
|
|
Personnel (Fill out section only if requesting new Position Control Numbers (PCN)s) |
|
|
Current Position Count for Service |
- |
- |
- |
- |
|
Additional Positions Request |
- |
- |
- |
- |
|
Total Personnel |
- |
- |
- |
- |
|
County Attorney’s Office Legal Review (for Harris County Code Items only) |
|
CAO Reviewer Name and Title |
|
CAO Review Completion Date |
Click or tap to enter a date. |
Anticipated Court Date: 11/12/2026
Anticipated Implementation Date (if different from Court date:
Emergency/Disaster Recovery Note: Not an emergency, disaster, or COVID-19 related item
Contact(s) name, title, department: Erwin Burden, P.E., CFM, Chief of Engineering and Architectural Services,
Office of the County Engineer
Attachments (if applicable): Contract & Exhibits